ITAC Assessment: SF0316
ITAC logo
ITAC Assessment: SF0316
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2005
Principal Product Corn Cattle Feed
NAICS 311211: Flour Milling
SIC 2041: Flour and Other Grain Mill Products
Sales Range $10
M
to 50
M
# of Employees 15
Plant Area 435,600
ft2
Annual Production 504,000
ton
Production Hrs. Annual 7,488
hrs
Location (State) California

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $365,793 4,263,600
kWh
Electricity Demand $134,204 12,348
kW-mo/yr
Natural Gas $957,039 132,880
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $59,371 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $13,880

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Electricity Fees Savings Natural Gas Savings
01 2.2135: Repair and eliminate steam leaks $4,516 - - - - $4,516
-
MMBtu
02 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $4,068 - $4,068
50,933
kWh
- - -
03 2.4235: Remove or close off unneeded compressed air lines $472 - $301
3,590
kWh
$171
-
kW-mo/yr
- -
04 2.2136: Install / repair insulation on steam lines $43,493 $15,595 - - - $43,493
-
MMBtu
05 2.7142: Utilize higher efficiency lamps and/or ballasts $2,320 $1,512 $1,910
22,801
kWh
$410
-
kW-mo/yr
- -
06 2.4133: Use most efficient type of electric motors $2,504 $2,562 $2,077
24
kWh
$427
-
kW-mo/yr
- -
07 2.3212: Optimize plant power factor $1,998 $3,852 - - $1,998 -
TOTAL RECOMMENDED $59,371 $23,521 $8,356
77,348
kWh
$1,008
-
kW-mo/yr
$1,998 $48,009
-
MMBtu
TOTAL IMPLEMENTED $13,880 $4,074 $8,356
77,348
kWh
$1,008
-
kW-mo/yr
- $4,516
-
MMBtu
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings Electricity Fees Savings Natural Gas Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs