Search Recommendations
ITAC logo
Search Recommendations
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

336

matching recommendations
$
$
ARC 2+ Digits Required
NAICS Flour milling and malt manufacturing
SIC 2+ Digits Required
3+ Characters Required for Products
ID Description Yearly
Savings
Imp
Cost
LL0295 #05 Y:2008 Utilize higher efficiency lamps and/or ballasts $586 $350
LL0295 #04 Y:2008 Use photocell controls $2,258 $210
LL0295 #03 Y:2008 Eliminate leaks in inert gas and compressed air lines/ valves $3,016 $760
LL0295 #02 Y:2008 Reduce space conditioning during non-working hours $3,831 $1,500
LL0295 #01 Y:2008 Use adjustable frequency drive or multiple speed motors on existing system $95,128 $96,000
WI0521 #07 Y:2006 Reduce the pressure of compressed air to the minimum required $630 -
WI0521 #06 Y:2006 Recharge batteries on during off-peak demand periods $1,035 $500
WI0521 #05 Y:2006 Install compressor air intakes in coolest locations $1,630 $3,200
WI0521 #04 Y:2006 Use waste heat from hot flue gases to preheat $5,386 $11,000
WI0521 #03 Y:2006 Modify refrigeration system to operate at a lower pressure $6,900 $18,000
WI0521 #02 Y:2006 Utilize higher efficiency lamps and/or ballasts $9,408 $13,600
WI0521 #01 Y:2006 Utilize other methods to remove contaminants $222,888 $230,600
LL0247 #06 Y:2006 Eliminate leaks in inert gas and compressed air lines/ valves $210 $120
LL0247 #05 Y:2006 Reduce the pressure of compressed air to the minimum required $333 $60
LL0247 #04 Y:2006 Use photocell controls $527 $150
LL0247 #03 Y:2006 Eliminate leaks in inert gas and compressed air lines/ valves $570 $151
LL0247 #02 Y:2006 Utilize higher efficiency lamps and/or ballasts $2,136 $1,373
LL0247 #01 Y:2006 Use adjustable frequency drive or multiple speed motors on existing system $3,342 $2,748
LL0248 #08 Y:2006 Install timers and/or thermostats $320 $50
LL0248 #07 Y:2006 Utilize higher efficiency lamps and/or ballasts $619 $150