ITAC Assessment: LL0248
ITAC logo
ITAC Assessment: LL0248
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2006
Principal Product Rice
NAICS 311212: Rice Milling
SIC 2044: Rice Milling
Sales Range $1
M
to 5
M
# of Employees 14
Plant Area 25,000
ft2
Annual Production 52,650,000
lb
Production Hrs. Annual 4,160
hrs
Location (State) Louisiana

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $60,771 560,671
kWh
Electricity Demand $14,067 781
kW-mo/yr
Electricity Fees $2,946 -
Natural Gas $139,239 10,456
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $37,377 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $14,622

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Electricity Fees Savings Natural Gas Savings Personnel Changes Savings One-time Revenue or Avoided Cost Savings
01 2.4146: Use adjustable frequency drive or multiple speed motors on existing system $21,816 $14,656 $20,997
193,697
kWh
- $819 - - -
02 2.7142: Utilize higher efficiency lamps and/or ballasts $10,463 $1,022 $8,197
75,617
kWh
$1,873
-
kW-mo/yr
$393 - - -
03 4.611: Begin a practice of predictive / preventative maintenance $1,218 $80 $14
125
kWh
- $1 - $203 $1,000
04 2.4231: Reduce the pressure of compressed air to the minimum required $1,082 $20 $663
6,117
kWh
$378
-
kW-mo/yr
$41 - - -
05 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $959 $151 - - - $959
-
MMBtu
- -
06 4.652: Replace existing equipment with more suitable substitutes $900 $300 - - - - $900 -
07 2.7142: Utilize higher efficiency lamps and/or ballasts $619 $150 $596
5,501
kWh
- $23 - - -
08 2.7261: Install timers and/or thermostats $320 $50 - - - $320
-
MMBtu
- -
TOTAL RECOMMENDED $37,377 $16,429 $30,467
281,057
kWh
$2,251
-
kW-mo/yr
$1,277 $1,279
-
MMBtu
$1,103 $1,000
TOTAL IMPLEMENTED $14,622 $1,573 $8,874
81,859
kWh
$2,251
-
kW-mo/yr
$435 $959
-
MMBtu
$1,103 $1,000
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings Electricity Fees Savings Natural Gas Savings Personnel Changes Savings One-time Revenue or Avoided Cost Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs