Assessment Year | 2006 |
---|---|
Principal Product | Rice |
NAICS | 311212: Rice Milling |
SIC | 2044: Rice Milling |
Sales Range | $1 M to 5M |
# of Employees | 14 |
Plant Area |
25,000
ft2
|
Annual Production | 52,650,000
lb
|
Production Hrs. Annual | 4,160
hrs
|
Location (State) | Louisiana |
Facility Energy Cost and Usage
Source | Yearly Cost | Usage | Unit Cost | |
---|---|---|---|---|
Electricity Usage | $60,771 | 560,671 |
kWh
|
$0.11 |
Electricity Demand | $14,067 | 781 |
kW-mo/yr
|
$18.01 |
Electricity Fees | $2,946 | - |
|
- |
Natural Gas | $139,239 | 10,456 |
MMBtu
|
$13.32 |
TOTAL YEARLY COSTS | - | |||
RECOMMENDED SAVINGS* | $37,377 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
IMPLEMENTED SAVINGS* | $14,622 |
Recommendations
# | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Electricity Demand Savings | Electricity Fees Savings | Natural Gas Savings | Personnel Changes Savings | One-time Revenue or Avoided Cost Savings |
---|---|---|---|---|---|---|---|---|---|---|
01 | 2.4146: Use adjustable frequency drive or multiple speed motors on existing system | $21,816 | $14,656 |
$20,997
193,697
kWh
|
- | $819 | - | - | - | |
02 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $10,463 | $1,022 |
$8,197
75,617
kWh
|
$1,873
-
kW-mo/yr
|
$393 | - | - | - | |
03 | 4.611: Begin a practice of predictive / preventative maintenance | $1,218 | $80 |
$14
125
kWh
|
- | $1 | - | $203 | $1,000 | |
04 | 2.4231: Reduce the pressure of compressed air to the minimum required | $1,082 | $20 |
$663
6,117
kWh
|
$378
-
kW-mo/yr
|
$41 | - | - | - | |
05 | 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves | $959 | $151 | - | - | - |
$959
-
MMBtu
|
- | - | |
06 | 4.652: Replace existing equipment with more suitable substitutes | $900 | $300 | - | - | - | - | $900 | - | |
07 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $619 | $150 |
$596
5,501
kWh
|
- | $23 | - | - | - | |
08 | 2.7261: Install timers and/or thermostats | $320 | $50 | - | - | - |
$320
-
MMBtu
|
- | - | |
TOTAL RECOMMENDED | $37,377 | $16,429 |
$30,467
281,057
kWh
|
$2,251
-
kW-mo/yr
|
$1,277 |
$1,279
-
MMBtu
|
$1,103 | $1,000 | ||
TOTAL IMPLEMENTED | $14,622 | $1,573 |
$8,874
81,859
kWh
|
$2,251
-
kW-mo/yr
|
$435 |
$959
-
MMBtu
|
$1,103 | $1,000 | ||
Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | Electricity Demand Savings | Electricity Fees Savings | Natural Gas Savings | Personnel Changes Savings | One-time Revenue or Avoided Cost Savings |
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs