Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 1982
Principal Product SALT, PEPPER AND SUGAR
NAICS
n/a
SIC 2899: Chemicals and Chemical Preparations, Not Elsewhere Classified
Sales Range $10
M
to 50
M
# of Employees 85
Plant Area
n/a
Annual Production 3,000,000,000
lb
Production Hrs. Annual 4,500
hrs
Location (State) Oklahoma

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $71,191 1,843,200
kWh
Natural Gas $16,109 5,324
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $8,056 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $8,056

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Natural Gas Savings
01 2.7312: Minimize use of outside make-up air for ventilation except when used for economizer cycle $3,020 $2,680 - $3,020
-
MMBtu
02 2.7422: Plant trees or shrubs near windows to shield from sunlight $1,682 $4,000 $1,682
58,617
kWh
-
03 2.7142: Utilize higher efficiency lamps and/or ballasts $2,994 $922 $2,994
83,529
kWh
-
04 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $360 $15 $360
12,603
kWh
-
TOTAL RECOMMENDED $8,056 $7,617 $5,036
154,749
kWh
$3,020
-
MMBtu
TOTAL IMPLEMENTED $8,056 $7,617 $5,036
154,749
kWh
$3,020
-
MMBtu
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs