ITAC Assessment: LL0247
ITAC logo
ITAC Assessment: LL0247
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2006
Principal Product Rice drying
NAICS 311212: Rice Milling
SIC 2044: Rice Milling
Sales Range $1
M
to 5
M
# of Employees 4
Plant Area 30,000
ft2
Annual Production 214,000
bbl
Production Hrs. Annual 3,640
hrs
Location (State) Louisiana

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $27,134 348,341
kWh
Electricity Demand $7,961 1,678
kW-mo/yr
Electricity Fees $3,340 -
Natural Gas $52,425 4,777
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $7,118 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $1,113

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Fees Savings Natural Gas Savings
01 2.4146: Use adjustable frequency drive or multiple speed motors on existing system $3,342 $2,748 $3,052
39,172
kWh
$290 -
02 2.7142: Utilize higher efficiency lamps and/or ballasts $2,136 $1,373 $1,951
25,050
kWh
$185 -
03 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $570 $151 - - $570
-
MMBtu
04 2.7134: Use photocell controls $527 $150 $481
6,180
kWh
$46 -
05 2.4231: Reduce the pressure of compressed air to the minimum required $333 $60 $304
3,896
kWh
$29 -
06 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $210 $120 $192
2,471
kWh
$18 -
TOTAL RECOMMENDED $7,118 $4,602 $5,980
76,769
kWh
$568 $570
-
MMBtu
TOTAL IMPLEMENTED $1,113 $331 $496
6,367
kWh
$47 $570
-
MMBtu
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Fees Savings Natural Gas Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs