Search Recommendations
ITAC logo
Search Recommendations
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

336

matching recommendations
$
$
ARC 2+ Digits Required
NAICS Flour milling and malt manufacturing
SIC 2+ Digits Required
3+ Characters Required for Products
ID Description Yearly
Savings
Imp
Cost
MI0318 #01 Y:2017 Turn off equipment when not in use $60,626 $3,600
IA0549 #09 Y:2015 Utilize higher efficiency lamps and/or ballasts $329 $1,151
IA0549 #08 Y:2015 Install occupancy sensors $837 $300
IA0549 #07 Y:2015 Direct warmest air to combustion intake $900 $300
IA0549 #06 Y:2015 Reduce the pressure of compressed air to the minimum required $1,395 $70
IA0549 #05 Y:2015 Eliminate leaks in inert gas and compressed air lines/ valves $2,708 $593
IA0549 #04 Y:2015 Install compressor air intakes in coolest locations $5,000 $704
IA0549 #03 Y:2015 Use heat from boiler blowdown to preheat boiler feed water $5,200 $700
IA0549 #02 Y:2015 Utilize higher efficiency lamps and/or ballasts $19,832 $20,111
IA0549 #01 Y:2015 Use most efficient type of electric motors $8,365 $16,877
OR0629 #04 Y:2014 Replace boiler $523,306 $3,403,664
OR0629 #03 Y:2014 Recover and reuse cooling water $58,681 $3,764
OR0629 #02 Y:2014 Re-use or recycle hot or cold process exhaust air $37,863 $38,930
OR0629 #01 Y:2014 Redesign flow to minimize mass transfer length $37,907 $21,000
IP0022 #08 Y:2013 Install compressor air intakes in coolest locations $706 $1,711
IP0022 #07 Y:2013 Utilize higher efficiency lamps and/or ballasts $870 $1,590
IP0022 #06 Y:2013 Utilize energy-efficient belts and other improved mechanisms $2,458 $2,226
IP0022 #05 Y:2013 Analyze flue gas for proper air/fuel ratio $4,308 $3,528
IP0022 #04 Y:2013 Install outside air damper / economizer on hvac unit $2,868 $2,394
IP0022 #03 Y:2013 Install occupancy sensors $631 $212