ITAC Assessment: MI0318
ITAC logo
ITAC Assessment: MI0318
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2017
Principal Product Biscuit Foodsd
NAICS 311211: Flour Milling
SIC 2041: Flour and Other Grain Mill Products
Sales Range $10
M
to 50
M
# of Employees 180
Plant Area 89,407
ft2
Annual Production 65,000
lb
Production Hrs. Annual 4,208
hrs
Location (State) Puerto Rico

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $461,718 3,081,434
kWh
Electricity Demand $68,136 6,990
kW-mo/yr
Electricity Fees $6,318 -
TOTAL YEARLY COSTS $536,172
RECOMMENDED SAVINGS* $150,223 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $127,608

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Administrative Changes Savings
01 2.6218: Turn off equipment when not in use $60,626 $3,600 $60,626
404,170
kWh
- -
02 2.7142: Utilize higher efficiency lamps and/or ballasts $32,550 $39,636 $27,327
182,182
kWh
$5,223
-
kW-mo/yr
-
03 2.2511: Insulate bare equipment $21,088 $106,884 $16,570
110,467
kWh
$4,518
-
kW-mo/yr
-
04 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $12,714 $1,660 $11,701
78,011
kWh
$1,013
-
kW-mo/yr
-
05 2.7447: Install vinyl strip / high speed / air curtain doors $8,034 $9,660 $7,361
49,072
kWh
$673
-
kW-mo/yr
-
06 2.4239: Eliminate or reduce compressed air usage $4,318 $3,540 $3,626
24,173
kWh
$692
-
kW-mo/yr
-
07 2.3131: Reschedule plant operations or reduce load to avoid peaks $4,294 $100 - - $4,294
08 2.7121: Utilize daylight whenever possible in lieu of artificial light $3,591 $4,940 $3,015
20,098
kWh
$576
-
kW-mo/yr
-
09 2.7447: Install vinyl strip / high speed / air curtain doors $1,527 $3,864 $1,283
8,556
kWh
$244
-
kW-mo/yr
-
10 2.7142: Utilize higher efficiency lamps and/or ballasts $1,481 $1,469 $1,481
9,872
kWh
- -
TOTAL RECOMMENDED $150,223 $175,353 $132,990
886,601
kWh
$12,939
-
kW-mo/yr
$4,294
TOTAL IMPLEMENTED $127,608 $64,605 $115,137
767,578
kWh
$8,177
-
kW-mo/yr
$4,294
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings Administrative Changes Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs