336
matching recommendations| ID | # | Year | Description | Yearly Savings |
Implementation
Imp Cost |
Status |
|---|---|---|---|---|---|---|
| LS2418 #06 Y:2024 | 06 | 2024 | Use solar heat to make electricty | $38,367 | $514,800 | |
| LS2418 #05 Y:2024 | 05 | 2024 | Replace fossil fuel equipment with electrical equipment | $182,554 | $481,830 | |
| LS2418 #04 Y:2024 | 04 | 2024 | Install timers and/or thermostats | $627 | $165 | |
| LS2418 #03 Y:2024 | 03 | 2024 | Eliminate leaks in inert gas and compressed air lines/ valves | $1,563 | $135 | |
| LS2418 #02 Y:2024 | 02 | 2024 | Utilize energy-efficient belts and other improved mechanisms | $2,302 | $200 | |
| LS2418 #01 Y:2024 | 01 | 2024 | Reduce the pressure of compressed air to the minimum required | $2,114 | $50 | |
| LE0562 #08 Y:2024 | 08 | 2024 | Use properly designed and sized hvac equipment | $13,989 | $60,600 | |
| LE0562 #07 Y:2024 | 07 | 2024 | Preheat combustion air with waste heat | $3,491 | $8,000 | |
| LE0562 #06 Y:2024 | 06 | 2024 | Use adjustable frequency drive or multiple speed motors on existing system | $6,738 | $13,669 | |
| LE0562 #05 Y:2024 | 05 | 2024 | Re-use or recycle hot or cold process exhaust air | $727 | $1,000 | |
| LE0562 #04 Y:2024 | 04 | 2024 | Meter recycled water (to reduce sewer charges) | $4,836 | $5,000 | |
| LE0562 #03 Y:2024 | 03 | 2024 | Use / purchase optimum sized compressor | $27,865 | $27,000 | |
| LE0562 #02 Y:2024 | 02 | 2024 | Install occupancy sensors | $1,612 | $350 | |
| LE0562 #01 Y:2024 | 01 | 2024 | Install timers and/or thermostats | $4,513 | $320 | |
| OR0777 #03 Y:2023 | 03 | 2023 | Eliminate or reduce compressed air usage | $2,570 | - | |
| OR0777 #02 Y:2023 | 02 | 2023 | Install common header on compressors | $2,832 | $6,989 | |
| OR0777 #01 Y:2023 | 01 | 2023 | Use adjustable frequency drive or multiple speed motors on existing system | $8,479 | - | |
| MZ0338 #06 Y:2023 | 06 | 2023 | Lower temperature during the winter season and vice-versa | $2,195 | $240 | |
| MZ0338 #05 Y:2023 | 05 | 2023 | Utilize higher efficiency lamps and/or ballasts | $4,644 | $13,800 | |
| MZ0338 #04 Y:2023 | 04 | 2023 | Use adjustable frequency drive or multiple speed motors on existing system | $60,112 | $127,747 |