ITAC Assessment: LE0562
ITAC logo
ITAC Assessment: LE0562
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2024
Principal Product Frozen Pita
NAICS 311211: Flour Milling
SIC 2051: Bread and Other Bakery Products, Except Cookies and Crackers
Sales Range $10
M
to 50
M
# of Employees 65
Plant Area 150,000
ft2
Annual Production 2,000
units
Production Hrs. Annual 6,552
hrs
Location (State) New Jersey

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $149,314 1,239,368
kWh
Electricity Demand $22,934 3,688
kW-mo/yr
Electricity Fees $20,158 -
Natural Gas $103,862 7,283
MMBtu
Waste Disposal Costs
Water Usage $24,181 1,724
Tgal
TOTAL YEARLY COSTS $320,449
RECOMMENDED SAVINGS* $63,771 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $10,343

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Natural Gas Savings Water Usage Savings One-time Revenue or Avoided Cost Savings
01 2.7261: Install timers and/or thermostats $4,513 $320 $1,818
15,150
kWh
- $2,695
-
MMBtu
- -
02 2.7135: Install occupancy sensors $1,612 $350 $1,612
13,432
kWh
- - - -
03 2.4226: Use / purchase optimum sized compressor $27,865 $27,000 - - - - $27,865
04 3.4116: Meter recycled water (to reduce sewer charges) $4,836 $5,000 - - - $4,836
-
Tgal
-
05 2.2443: Re-use or recycle hot or cold process exhaust air $727 $1,000 - - $727
-
MMBtu
- -
06 2.4146: Use adjustable frequency drive or multiple speed motors on existing system $6,738 $13,669 $6,290
52,416
kWh
$448
-
kW-mo/yr
- - -
07 2.2442: Preheat combustion air with waste heat $3,491 $8,000 $(-619.0)
(-5,156)
kWh
$(-168.0)
-
kW-mo/yr
$4,278
-
MMBtu
- -
08 2.7233: Use properly designed and sized hvac equipment $13,989 $60,600 - - $13,989
-
MMBtu
- -
TOTAL RECOMMENDED $63,771 $115,939 $9,101
75,842
kWh
$280
-
kW-mo/yr
$21,689
-
MMBtu
$4,836
-
Tgal
$27,865
TOTAL IMPLEMENTED $10,343 $9,670 $2,811
23,426
kWh
$(-168.0)
-
kW-mo/yr
$7,700
-
MMBtu
- -
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings Natural Gas Savings Water Usage Savings One-time Revenue or Avoided Cost Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs