Assessment Year | 2024 |
---|---|
Principal Product | Frozen Pita |
NAICS | 311211: Flour Milling |
SIC | 2051: Bread and Other Bakery Products, Except Cookies and Crackers |
Sales Range | $10 M to 50M |
# of Employees | 65 |
Plant Area |
150,000
ft2
|
Annual Production | 2,000
units
|
Production Hrs. Annual | 6,552
hrs
|
Location (State) | New Jersey |
Facility Energy Cost and Usage
Source | Yearly Cost | Usage | Unit Cost | ||
---|---|---|---|---|---|
Electricity Usage | $149,314 | 1,239,368 |
kWh
|
$0.12 | |
Electricity Demand | $22,934 | 3,688 |
kW-mo/yr
|
$6.22 | |
Electricity Fees | $20,158 | - |
|
- | |
Natural Gas | $103,862 | 7,283 |
MMBtu
|
$14.26 | |
Waste Disposal Costs | |||||
Water Usage | $24,181 | 1,724 |
Tgal
|
$14.03 | |
TOTAL YEARLY COSTS | $320,449 | ||||
RECOMMENDED SAVINGS* | $63,771 |
See individual recommendations below
*Non-energy impacts included in savings.
|
|||
IMPLEMENTED SAVINGS* | $10,343 |
Recommendations
# | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Electricity Demand Savings | Natural Gas Savings | Water Usage Savings | One-time Revenue or Avoided Cost Savings |
---|---|---|---|---|---|---|---|---|---|
01 | 2.7261: Install timers and/or thermostats | $4,513 | $320 |
$1,818
15,150
kWh
|
- |
$2,695
-
MMBtu
|
- | - | |
02 | 2.7135: Install occupancy sensors | $1,612 | $350 |
$1,612
13,432
kWh
|
- | - | - | - | |
03 | 2.4226: Use / purchase optimum sized compressor | $27,865 | $27,000 | - | - | - | - | $27,865 | |
04 | 3.4116: Meter recycled water (to reduce sewer charges) | $4,836 | $5,000 | - | - | - |
$4,836
-
Tgal
|
- | |
05 | 2.2443: Re-use or recycle hot or cold process exhaust air | $727 | $1,000 | - | - |
$727
-
MMBtu
|
- | - | |
06 | 2.4146: Use adjustable frequency drive or multiple speed motors on existing system | $6,738 | $13,669 |
$6,290
52,416
kWh
|
$448
-
kW-mo/yr
|
- | - | - | |
07 | 2.2442: Preheat combustion air with waste heat | $3,491 | $8,000 |
$(-619.0)
(-5,156)
kWh
|
$(-168.0)
-
kW-mo/yr
|
$4,278
-
MMBtu
|
- | - | |
08 | 2.7233: Use properly designed and sized hvac equipment | $13,989 | $60,600 | - | - |
$13,989
-
MMBtu
|
- | - | |
TOTAL RECOMMENDED | $63,771 | $115,939 |
$9,101
75,842
kWh
|
$280
-
kW-mo/yr
|
$21,689
-
MMBtu
|
$4,836
-
Tgal
|
$27,865 | ||
TOTAL IMPLEMENTED | $10,343 | $9,670 |
$2,811
23,426
kWh
|
$(-168.0)
-
kW-mo/yr
|
$7,700
-
MMBtu
|
- | - | ||
Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | Electricity Demand Savings | Natural Gas Savings | Water Usage Savings | One-time Revenue or Avoided Cost Savings |
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs