| Assessment Year | 2023 |
|---|---|
| Principal Product | frozen baked goods |
| NAICS | 311211: Flour Milling |
| SIC | 2041: Flour and Other Grain Mill Products |
| Sales Range | $100 M to 500M |
| # of Employees | 450 |
| Plant Area |
504,000
ft2
|
| Annual Production | 650,000,000
lb
|
| Production Hrs. Annual | 8,160
hrs
|
| Location (State) | Missouri |
Facility Energy Cost and Usage
| Source | Yearly Cost | Usage | Unit Cost | ||
|---|---|---|---|---|---|
| Electricity Usage | $4,183,240 | 128,675,640 |
kWh
|
$0.033 | |
| Electricity Demand | $1,932,549 | 118,867 |
kW-mo/yr
|
$16.26 | |
| Natural Gas | $437,553 | 57,337 |
MMBtu
|
$7.63 | |
| Waste Disposal Costs | |||||
| Water Usage | $279,287 | 85,140 |
Tgal
|
$3.28 | |
| Water Disposal | $188,706 | 35,317 |
Tgal
|
$5.34 | |
| TOTAL YEARLY COSTS | $7,021,335 | ||||
| RECOMMENDED SAVINGS* | $648,889 |
See individual recommendations below
*Non-energy impacts included in savings.
|
|||
| IMPLEMENTED SAVINGS* | $69,703 | ||||
Recommendations
| # | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Electricity Demand Savings |
|---|---|---|---|---|---|---|
| 01 | 2.9114: Use solar heat to make electricty | $576,991 | $4,487,250 |
$335,042
10,152,786
kWh
|
$241,949
-
kW-mo/yr
|
|
| 02 | 2.2628: Utilize a less expensive cooling method | $2,823 | $860 |
$1,490
45,178
kWh
|
$1,333
-
kW-mo/yr
|
|
| 03 | 2.7135: Install occupancy sensors | $2,124 | $3,920 |
$2,124
64,366
kWh
|
- | |
| 04 | 2.4146: Use adjustable frequency drive or multiple speed motors on existing system | $60,112 | $127,747 |
$60,112
1,821,609
kWh
|
- | |
| 05 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $4,644 | $13,800 |
$2,693
81,600
kWh
|
$1,951
-
kW-mo/yr
|
|
| 06 | 2.7221: Lower temperature during the winter season and vice-versa | $2,195 | $240 |
$244
7,387
kWh
|
$1,951
-
kW-mo/yr
|
|
| TOTAL RECOMMENDED | $648,889 | $4,633,817 |
$401,705
12,172,926
kWh
|
$247,184
-
kW-mo/yr
|
||
| TOTAL IMPLEMENTED | $69,703 | $146,327 |
$66,419
2,012,753
kWh
|
$3,284
-
kW-mo/yr
|
||
| Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | Electricity Demand Savings | |||
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs