ITAC Assessment: MZ0338
ITAC logo
ITAC Assessment: MZ0338
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2023
Principal Product frozen baked goods
NAICS 311211: Flour Milling
SIC 2041: Flour and Other Grain Mill Products
Sales Range $100
M
to 500
M
# of Employees 450
Plant Area 504,000
ft2
Annual Production 650,000,000
lb
Production Hrs. Annual 8,160
hrs
Location (State) Missouri

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $4,183,240 128,675,640
kWh
Electricity Demand $1,932,549 118,867
kW-mo/yr
Natural Gas $437,553 57,337
MMBtu
Waste Disposal Costs
Water Usage $279,287 85,140
Tgal
Water Disposal $188,706 35,317
Tgal
TOTAL YEARLY COSTS $7,021,335
RECOMMENDED SAVINGS* $648,889 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $69,703

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings
01 2.9114: Use solar heat to make electricty $576,991 $4,487,250 $335,042
10,152,786
kWh
$241,949
-
kW-mo/yr
02 2.2628: Utilize a less expensive cooling method $2,823 $860 $1,490
45,178
kWh
$1,333
-
kW-mo/yr
03 2.7135: Install occupancy sensors $2,124 $3,920 $2,124
64,366
kWh
-
04 2.4146: Use adjustable frequency drive or multiple speed motors on existing system $60,112 $127,747 $60,112
1,821,609
kWh
-
05 2.7142: Utilize higher efficiency lamps and/or ballasts $4,644 $13,800 $2,693
81,600
kWh
$1,951
-
kW-mo/yr
06 2.7221: Lower temperature during the winter season and vice-versa $2,195 $240 $244
7,387
kWh
$1,951
-
kW-mo/yr
TOTAL RECOMMENDED $648,889 $4,633,817 $401,705
12,172,926
kWh
$247,184
-
kW-mo/yr
TOTAL IMPLEMENTED $69,703 $146,327 $66,419
2,012,753
kWh
$3,284
-
kW-mo/yr
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs