| Assessment Year | 1998 |
|---|---|
| Principal Product | Airbag modules |
| NAICS |
n/a
|
| SIC | 2399: Fabricated Textile Products, Not Elsewhere Classified |
| Sales Range | $100 M to 500M |
| # of Employees | 400 |
| Plant Area |
110,000
ft2
|
| Annual Production | 3,300,000
pieces
|
| Production Hrs. Annual | 8,736
hrs
|
| Location (State) | Tennessee |
Facility Energy Cost and Usage
| Source | Yearly Cost | Usage | Unit Cost | |
|---|---|---|---|---|
| Electricity Usage | $149,450 | 4,934,936 |
kWh
|
$0.030 |
| Electricity Demand | $89,419 | 10,793 |
kW-mo/yr
|
$8.28 |
| Electricity Fees | $3,994 | - |
|
- |
| Natural Gas | $11,130 | 1,421 |
MMBtu
|
$7.83 |
| TOTAL YEARLY COSTS | - | |||
| RECOMMENDED SAVINGS* | $2,861,585 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
| IMPLEMENTED SAVINGS* | $1,970,990 | |||
Recommendations
| # | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Electricity Demand Savings | Solid Waste (non-haz) Savings | Personnel Changes Savings | Administrative Changes Savings | Primary Raw Material Savings | Primary Product Savings |
|---|---|---|---|---|---|---|---|---|---|---|---|
| 01 | 4.431: Train operators for maximum operating efficiency | $1,949,360 | $103,200 | - | - | - | $(-307,840.0) | - | - | $2,257,200 | |
| 02 | 3.1192: Reduce scrap production | $887,305 | $103,200 | - | - |
$1,150
-
lb
|
$(-268,125.0) | - | $1,154,280 | - | |
| 03 | 3.5316: Contract a wood pallet recycling company | $17,940 | - | - | - |
$3,090
-
lb
|
- | $14,850 | - | - | |
| 04 | 2.4231: Reduce the pressure of compressed air to the minimum required | $3,690 | - |
$2,370
79,132
kWh
|
$1,320
-
kW-mo/yr
|
- | - | - | - | - | |
| 05 | 2.7122: Disconnect ballasts | $3,290 | $980 |
$2,370
75,615
kWh
|
$920
-
kW-mo/yr
|
- | - | - | - | - | |
| TOTAL RECOMMENDED | $2,861,585 | $207,380 |
$4,740
154,747
kWh
|
$2,240
-
kW-mo/yr
|
$4,240
-
lb
|
$(-575,965.0) | $14,850 | $1,154,280 | $2,257,200 | ||
| TOTAL IMPLEMENTED | $1,970,990 | $103,200 |
$2,370
79,132
kWh
|
$1,320
-
kW-mo/yr
|
$3,090
-
lb
|
$(-307,840.0) | $14,850 | - | $2,257,200 | ||
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs