Assessment Year | 2025 |
---|---|
Principal Product | Gas Turbines |
NAICS | 333611: Turbine and Turbine Generator Set Units Manufacturing |
SIC | 3511: Steam, Gas, and Hydraulic Turbines, and Turbine Generator Set Units |
Sales Range | $50 M to 100M |
# of Employees | 110 |
Plant Area |
69,000
ft2
|
Annual Production | 200
units
|
Production Hrs. Annual | 2,423
hrs
|
Location (State) | California |
Facility Energy Cost and Usage
Source | Yearly Cost | Usage | Unit Cost | |
---|---|---|---|---|
Electricity Usage | $288,832 | 1,681,371 |
kWh
|
$0.17 |
Electricity Demand | $127,278 | 13,815 |
kW-mo/yr
|
$9.21 |
Electricity Fees | $56,733 | - |
|
- |
Natural Gas | $26,052 | 3,483 |
MMBtu
|
$7.48 |
TOTAL YEARLY COSTS | $498,895 | |||
RECOMMENDED SAVINGS* | $466,893 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
IMPLEMENTED SAVINGS* | - |
Recommendations
# | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Electricity Demand Savings |
---|---|---|---|---|---|---|
01 | 2.9114: Use solar heat to make electricty | $254,982 | $555,003 |
$207,801
1,209,550
kWh
|
$47,181
-
kW-mo/yr
|
|
02 | 2.3141: Use battery storage for demand control | $66,206 | $29,341 |
$(-38,577.7)
(-224,550)
kWh
|
$104,784
-
kW-mo/yr
|
|
03 | 2.4231: Reduce the pressure of compressed air to the minimum required | $1,775 | - |
$1,775
10,334
kWh
|
- | |
04 | 2.4239: Eliminate or reduce compressed air usage | $3,208 | $2,050 |
$3,208
18,675
kWh
|
- | |
05 | 2.4223: Install direct acting units in place of compressed air pressure system in safety system | $3,614 | $4,200 |
$3,614
21,035
kWh
|
- | |
06 | 2.4146: Use adjustable frequency drive or multiple speed motors on existing system | $922 | $1,623 |
$834
4,852
kWh
|
$89
-
kW-mo/yr
|
|
07 | 2.4146: Use adjustable frequency drive or multiple speed motors on existing system | $300 | $1,214 |
$271
1,581
kWh
|
$29
-
kW-mo/yr
|
|
08 | 2.4146: Use adjustable frequency drive or multiple speed motors on existing system | $1,230 | $3,246 |
$1,112
6,470
kWh
|
$118
-
kW-mo/yr
|
|
09 | 2.3212: Optimize plant power factor | $134,656 | - |
$131,736
766,799
kWh
|
$2,920
-
kW-mo/yr
|
|
TOTAL RECOMMENDED | $466,893 | $596,677 |
$311,772
1,814,746
kWh
|
$155,120
-
kW-mo/yr
|
||
TOTAL IMPLEMENTED | - | - | - | - | ||
Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | Electricity Demand Savings |
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs