ITAC Assessment: SD0668
ITAC logo
ITAC Assessment: SD0668
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2025
Principal Product Gas Turbines
NAICS 333611: Turbine and Turbine Generator Set Units Manufacturing
SIC 3511: Steam, Gas, and Hydraulic Turbines, and Turbine Generator Set Units
Sales Range $50
M
to 100
M
# of Employees 110
Plant Area 69,000
ft2
Annual Production 200
units
Production Hrs. Annual 2,423
hrs
Location (State) California

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $288,832 1,681,371
kWh
Electricity Demand $127,278 13,815
kW-mo/yr
Electricity Fees $56,733 -
Natural Gas $26,052 3,483
MMBtu
TOTAL YEARLY COSTS $498,895
RECOMMENDED SAVINGS* $466,893 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* -

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings
01 2.9114: Use solar heat to make electricty $254,982 $555,003 $207,801
1,209,550
kWh
$47,181
-
kW-mo/yr
02 2.3141: Use battery storage for demand control $66,206 $29,341 $(-38,577.7)
(-224,550)
kWh
$104,784
-
kW-mo/yr
03 2.4231: Reduce the pressure of compressed air to the minimum required $1,775 - $1,775
10,334
kWh
-
04 2.4239: Eliminate or reduce compressed air usage $3,208 $2,050 $3,208
18,675
kWh
-
05 2.4223: Install direct acting units in place of compressed air pressure system in safety system $3,614 $4,200 $3,614
21,035
kWh
-
06 2.4146: Use adjustable frequency drive or multiple speed motors on existing system $922 $1,623 $834
4,852
kWh
$89
-
kW-mo/yr
07 2.4146: Use adjustable frequency drive or multiple speed motors on existing system $300 $1,214 $271
1,581
kWh
$29
-
kW-mo/yr
08 2.4146: Use adjustable frequency drive or multiple speed motors on existing system $1,230 $3,246 $1,112
6,470
kWh
$118
-
kW-mo/yr
09 2.3212: Optimize plant power factor $134,656 - $131,736
766,799
kWh
$2,920
-
kW-mo/yr
TOTAL RECOMMENDED $466,893 $596,677 $311,772
1,814,746
kWh
$155,120
-
kW-mo/yr
TOTAL IMPLEMENTED - - - -
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs