ITAC Assessment: MA0782
ITAC logo
ITAC Assessment: MA0782
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2017
Principal Product Machined products for WW and wter industry
NAICS 333515: Cutting Tool and Machine Tool Accessory Manufacturing
SIC 3599: Industrial and Commercial Machinery and Equipment, Not Elsewhere Classified
Sales Range $1
M
to 5
M
# of Employees 17
Plant Area 110,625
ft2
Annual Production 52,000
units
Production Hrs. Annual 4,160
hrs
Location (State) Massachusetts

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $162,440 1,466,290
kWh
Electricity Demand $25,739 4,731
kW-mo/yr
Electricity Fees $20,960 -
LPG $34,545 1,924
MMBtu
TOTAL YEARLY COSTS $243,684
RECOMMENDED SAVINGS* $28,662 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $10,281

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings LPG Savings
01 2.1311: Replace electrically-operated equipment with fossil fuel equipment $18,221 $78,750 $29,174
262,832
kWh
$(-10,953.0)
-
MMBtu
02 2.2511: Insulate bare equipment $7,638 $1,583 $7,638
68,807
kWh
-
03 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $2,366 $600 $2,366
21,313
kWh
-
04 2.6218: Turn off equipment when not in use $277 $100 $277
2,499
kWh
-
05 2.7124: Make a practice of turning off lights when not needed $160 $100 $160
1,447
kWh
-
TOTAL RECOMMENDED $28,662 $81,133 $39,615
356,898
kWh
$(-10,953.0)
-
MMBtu
TOTAL IMPLEMENTED $10,281 $2,283 $10,281
92,619
kWh
-
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs