| Assessment Year | 1996 |
|---|---|
| Principal Product | Plastic Moldings |
| NAICS |
n/a
|
| SIC | 3612: Power, Distribution, and Specialty Transformers |
| Sales Range | $10 M to 50M |
| # of Employees | 150 |
| Plant Area |
68,200
ft2
|
| Annual Production | 1,200,000
pieces
|
| Production Hrs. Annual | 2,295
hrs
|
| Location (State) | Iowa |
Facility Energy Cost and Usage
| Source | Yearly Cost | Usage | Unit Cost | |
|---|---|---|---|---|
| Electricity Usage | $60,417 | 2,180,832 |
kWh
|
$0.028 |
| Electricity Demand | $60,098 | 8,412 |
kW-mo/yr
|
$7.14 |
| Electricity Fees | $5,840 | - |
|
- |
| Natural Gas | $14,960 | 3,072 |
MMBtu
|
$4.87 |
| TOTAL YEARLY COSTS | - | |||
| RECOMMENDED SAVINGS* | $8,486 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
| IMPLEMENTED SAVINGS* | $8,486 | |||
Recommendations
| # | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Electricity Demand Savings | Natural Gas Savings | Solid Waste (haz) Savings |
|---|---|---|---|---|---|---|---|---|
| 01 | 2.7241: Install outside air damper / economizer on hvac unit | $2,869 | $6,067 |
$2,869
103,458
kWh
|
- | - | - | |
| 02 | 2.7135: Install occupancy sensors | $2,554 | $1,447 |
$1,183
42,790
kWh
|
$1,371
-
kW-mo/yr
|
- | - | |
| 03 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $927 | $2,091 |
$388
14,068
kWh
|
$539
-
kW-mo/yr
|
- | - | |
| 04 | 2.7111: Reduce illumination to minimum necessary levels | $500 | $513 |
$205
7,913
kWh
|
$295
-
kW-mo/yr
|
- | - | |
| 05 | 2.4133: Use most efficient type of electric motors | $232 | $307 |
$91
3,224
kWh
|
$141
-
kW-mo/yr
|
- | - | |
| 06 | 2.4221: Install compressor air intakes in coolest locations | $134 | $235 |
$59
2,052
kWh
|
$75
-
kW-mo/yr
|
- | - | |
| 07 | 2.7447: Install vinyl strip / high speed / air curtain doors | $174 | $68 | - | - |
$174
-
MMBtu
|
- | |
| 08 | 3.6112: Use filter and drying oven to reduce sludge volume | $1,096 | $1,200 | - | - | - |
$1,096
-
lb
|
|
| TOTAL RECOMMENDED | $8,486 | $11,928 |
$4,795
173,505
kWh
|
$2,421
-
kW-mo/yr
|
$174
-
MMBtu
|
$1,096
-
lb
|
||
| TOTAL IMPLEMENTED | $8,486 | $11,928 |
$4,795
173,505
kWh
|
$2,421
-
kW-mo/yr
|
$174
-
MMBtu
|
$1,096
-
lb
|
||
| Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | Electricity Demand Savings | Natural Gas Savings | Solid Waste (haz) Savings | |||
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs