| Assessment Year | 1995 |
|---|---|
| Principal Product | PVC pipe |
| NAICS |
n/a
|
| SIC | 3084: Plastics Pipe |
| Sales Range | $10 M to 50M |
| # of Employees | 57 |
| Plant Area |
50,000
ft2
|
| Annual Production | 65,000,000
lb
|
| Production Hrs. Annual | 8,520
hrs
|
| Location (State) | Colorado |
Facility Energy Cost and Usage
| Source | Yearly Cost | Usage | Unit Cost | |
|---|---|---|---|---|
| Electricity Usage | $460,678 | 11,210,141 |
kWh
|
$0.041 |
| LPG | $36,179 | 8,636 |
MMBtu
|
$4.19 |
| TOTAL YEARLY COSTS | - | |||
| RECOMMENDED SAVINGS* | $24,100 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
| IMPLEMENTED SAVINGS* | $22,720 | |||
Recommendations
| # | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | LPG Savings |
|---|---|---|---|---|---|---|
| 01 | 2.7444: Close holes and openings in building such as broken windows | $8,120 | $19,640 |
$(-160.0)
(-4,396)
kWh
|
$8,280
-
MMBtu
|
|
| 02 | 2.4111: Utilize energy-efficient belts and other improved mechanisms | $6,240 | $5,620 |
$6,240
159,144
kWh
|
- | |
| 03 | 2.4133: Use most efficient type of electric motors | $3,960 | $6,260 |
$3,960
98,769
kWh
|
- | |
| 04 | 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves | $3,620 | $180 |
$3,620
83,822
kWh
|
- | |
| 05 | 2.2511: Insulate bare equipment | $1,380 | $510 |
$1,690
43,083
kWh
|
$(-310.0)
-
MMBtu
|
|
| 06 | 2.7111: Reduce illumination to minimum necessary levels | $780 | $240 |
$780
15,240
kWh
|
- | |
| TOTAL RECOMMENDED | $24,100 | $32,450 |
$16,130
395,662
kWh
|
$7,970
-
MMBtu
|
||
| TOTAL IMPLEMENTED | $22,720 | $31,940 |
$14,440
352,579
kWh
|
$8,280
-
MMBtu
|
||
| Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | LPG Savings | |||
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs