ITAC Assessment: LS2418
ITAC logo
ITAC Assessment: LS2418
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2024
Principal Product Rice Milling
NAICS 311212: Rice Milling
SIC 2044: Rice Milling
Sales Range $100
M
to 500
M
# of Employees 150
Plant Area 545,000
ft2
Annual Production 219,000
ton
Production Hrs. Annual 8,760
hrs
Location (State) Louisiana

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $642,950 7,360,640
kWh
LPG $117,605 5,493
MMBtu
TOTAL YEARLY COSTS $760,555
RECOMMENDED SAVINGS* $227,527 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* -

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings LPG Savings Administrative Changes Savings
01 2.4231: Reduce the pressure of compressed air to the minimum required $2,114 $50 $2,114
24,303
kWh
- -
02 2.4111: Utilize energy-efficient belts and other improved mechanisms $2,302 $200 $2,302
24,464
kWh
- -
03 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $1,563 $135 $1,563
17,970
kWh
- -
04 2.7261: Install timers and/or thermostats $627 $165 $627
7,210
kWh
- -
05 2.1321: Replace fossil fuel equipment with electrical equipment $182,554 $481,830 - $102,554
-
MMBtu
$80,000
06 2.9114: Use solar heat to make electricty $38,367 $514,800 $38,367
441,004
kWh
- -
TOTAL RECOMMENDED $227,527 $997,180 $44,973
514,951
kWh
$102,554
-
MMBtu
$80,000
TOTAL IMPLEMENTED - - - - -
Yearly Savings* Imp'd Cost* Electricity Usage Savings LPG Savings Administrative Changes Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs