Search Recommendations
ITAC logo
Search Recommendations
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

417

matching recommendations
$
$
ARC 2+ Digits Required
NAICS Other animal food manufacturing
SIC 2+ Digits Required
3+ Characters Required for Products
ID Description Yearly
Savings
Imp
Cost
BS0074 #01 Y:2016 Utilize energy-efficient belts and other improved mechanisms $249 $117
OK0937 #09 Y:2016 Use adjustable frequency drive or multiple speed motors on existing system $29,032 $132,000
OK0937 #08 Y:2016 Optimize plant power factor $9,089 $6,160
OK0937 #07 Y:2016 Use waste heat with a closed-cycle gas turbine-generator set to cogenerate electricity and heat $74,720 $594,190
OK0937 #06 Y:2016 Install outside air damper / economizer on hvac unit $1,197 $2,060
OK0937 #05 Y:2016 Analyze flue gas for proper air/fuel ratio $3,445 $12,000
OK0937 #04 Y:2016 Use waste heat from hot flue gases to preheat $3,363 $15,376
OK0937 #03 Y:2016 Utilize higher efficiency lamps and/or ballasts $9,346 $88,560
OK0937 #02 Y:2016 Utilize higher efficiency lamps and/or ballasts $1,667 $5,324
OK0937 #01 Y:2016 Recover waste heat from equipment $1,095 $1,646
MZ0136 #09 Y:2013 Reduce the pressure of compressed air to the minimum required $15,564 -
MZ0136 #08 Y:2013 Install / repair insulation on steam lines $44,793 $7,900
MZ0136 #07 Y:2013 Replace existing chiller with high efficiency model $13,943 $63,000
MZ0136 #06 Y:2013 Eliminate or reduce compressed air usage $13,112 $2,840
MZ0136 #05 Y:2013 Install occupancy sensors $16,863 $910
MZ0136 #04 Y:2013 Utilize higher efficiency lamps and/or ballasts $17,785 $18,300
MZ0136 #03 Y:2013 Maintain air filters by cleaning or replacement $282 $50
MZ0136 #02 Y:2013 Eliminate leaks in inert gas and compressed air lines/ valves $672 $1,600
MZ0136 #01 Y:2013 Install compressor air intakes in coolest locations $16,626 $290
WM0035 #07 Y:2013 Turn off equipment during breaks, reduce operating time $594 -