ITAC Assessment: OK0937
ITAC logo
ITAC Assessment: OK0937
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2016
Principal Product Animal Feed
NAICS 311119: Other Animal Food Manufacturing
SIC 2048: Prepared Feed and Feed Ingredients for Animals and Fowls, Except Dogs and Cats
Sales Range $5
M
to 10
M
# of Employees 42
Plant Area 140,000
ft2
Annual Production 180,000
ton
Production Hrs. Annual 6,432
hrs
Location (State) Oklahoma

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $272,338 4,502,400
kWh
Electricity Demand $81,607 14,046
kW-mo/yr
Natural Gas $50,062 15,406
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $132,954 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $14,458

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Fees Savings Natural Gas Savings Administrative Changes Savings
01 2.2437: Recover waste heat from equipment $1,095 $1,646 - - $1,095
-
MMBtu
-
02 2.7142: Utilize higher efficiency lamps and/or ballasts $1,667 $5,324 $1,667
27,782
kWh
- - -
03 2.7142: Utilize higher efficiency lamps and/or ballasts $9,346 $88,560 $9,346
133,560
kWh
- - -
04 2.2414: Use waste heat from hot flue gases to preheat $3,363 $15,376 - - $3,363
-
MMBtu
-
05 2.1233: Analyze flue gas for proper air/fuel ratio $3,445 $12,000 - - $3,445
-
MMBtu
-
06 2.7241: Install outside air damper / economizer on hvac unit $1,197 $2,060 $1,197
19,950
kWh
- - -
07 2.3417: Use waste heat with a closed-cycle gas turbine-generator set to cogenerate electricity and heat $74,720 $594,190 - $27,896 $46,824
-
MMBtu
-
08 2.3212: Optimize plant power factor $9,089 $6,160 - - - $9,089
09 2.4146: Use adjustable frequency drive or multiple speed motors on existing system $29,032 $132,000 $29,032
483,876
kWh
- - -
TOTAL RECOMMENDED $132,954 $857,316 $41,242
665,168
kWh
$27,896 $54,727
-
MMBtu
$9,089
TOTAL IMPLEMENTED $14,458 $105,884 $11,013
161,342
kWh
- $3,445
-
MMBtu
-
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Fees Savings Natural Gas Savings Administrative Changes Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs