Search Recommendations
ITAC logo
Search Recommendations
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

142

matching recommendations
$
$
ARC 2+ Digits Required
NAICS Dog and cat food manufacturing
SIC 2+ Digits Required
3+ Characters Required for Products
ID Description Yearly
Savings
Imp
Cost
LE0253 #03 Y:2007 Turn off equipment when not in use $22,542 $300
LE0253 #02 Y:2007 Eliminate/reduce an operation $40,620 $4,000
LE0253 #01 Y:2007 Install partitions to reduce size of conditioned space $41,910 $32,000
LM0103 #08 Y:2005 Develop standard procedures to improve internal yields $440,650 $1,500
LM0103 #07 Y:2005 Develop standard operating procedures $4,950 $1,500
LM0103 #06 Y:2005 Repair or replace steam traps $17,630 $4,000
LM0103 #05 Y:2005 Install / repair insulation on steam lines $2,159 $550
LM0103 #04 Y:2005 Utilize higher efficiency lamps and/or ballasts $49,470 $72,000
LM0103 #03 Y:2005 Reduce the pressure of compressed air to the minimum required $2,520 -
LM0103 #02 Y:2005 Eliminate leaks in inert gas and compressed air lines/ valves $11,585 $175
LM0103 #01 Y:2005 Use most efficient type of electric motors $26,190 $5,596
CO0567 #05 Y:2005 Utilize higher efficiency lamps and/or ballasts $510 $1,810
CO0567 #04 Y:2005 Install vinyl strip / high speed / air curtain doors $2,350 $4,820
CO0567 #03 Y:2005 Utilize higher efficiency lamps and/or ballasts $2,500 $11,600
CO0567 #02 Y:2005 Use most efficient type of electric motors $1,013 $1,156
CO0567 #01 Y:2005 Use demand controller or load shedder $17,730 $23,760
UD0720 #15 Y:2005 Install motor voltage controller on lightly loaded motors $200 $340
UD0720 #14 Y:2005 Use photocell controls $296 $500
UD0720 #13 Y:2005 Minimize operation of equipment maintained in standby condition $390 -
UD0720 #12 Y:2005 Insulate bare equipment $483 $379