Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2005
Principal Product Meat Ingredients for Pet Food
NAICS 311111: Dog and Cat Food Manufacturing
SIC 2047: Dog and Cat Food
Sales Range $10
M
to 50
M
# of Employees 40
Plant Area 39,000
ft2
Annual Production 10,000,000
lb
Production Hrs. Annual 5,720
hrs
Location (State) Colorado

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $186,063 5,880,110
kWh
Electricity Demand $163,764 12,031
kW-mo/yr
Electricity Fees $201 -
Natural Gas $11,906 1,492
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $24,103 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $6,373

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Personnel Changes Savings Ancillary Material Cost Savings
01 2.3191: Use demand controller or load shedder $17,730 $23,760 $13,140
384,000
kWh
$4,590
-
kW-mo/yr
- -
02 2.4133: Use most efficient type of electric motors $1,013 $1,156 $587
17,137
kWh
$426
-
kW-mo/yr
- -
03 2.7142: Utilize higher efficiency lamps and/or ballasts $2,500 $11,600 $1,380
40,200
kWh
$1,050
-
kW-mo/yr
- $70
04 2.7447: Install vinyl strip / high speed / air curtain doors $2,350 $4,820 $2,320
67,900
kWh
$30
-
kW-mo/yr
- -
05 2.7142: Utilize higher efficiency lamps and/or ballasts $510 $1,810 $120
3,400
kWh
$70
-
kW-mo/yr
$190 $130
TOTAL RECOMMENDED $24,103 $43,146 $17,547
512,637
kWh
$6,166
-
kW-mo/yr
$190 $200
TOTAL IMPLEMENTED $6,373 $19,386 $4,407
128,637
kWh
$1,576
-
kW-mo/yr
$190 $200
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs