| Assessment Year | 2007 |
|---|---|
| Principal Product | Canned Cat/Dog Food |
| NAICS | 311111: Dog and Cat Food Manufacturing |
| SIC | 2047: Dog and Cat Food |
| Sales Range | $50 M to 100M |
| # of Employees | 197 |
| Plant Area |
186,000
ft2
|
| Annual Production | 10,000,000
units
|
| Production Hrs. Annual | 8,400
hrs
|
| Location (State) | New Jersey |
Facility Energy Cost and Usage
| Source | Yearly Cost | Usage | Unit Cost | |
|---|---|---|---|---|
| Electricity Usage | $548,946 | 6,969,680 |
kWh
|
$0.079 |
| Electricity Demand | $113,445 | 15,455 |
kW-mo/yr
|
$7.34 |
| Natural Gas | $1,041,226 | 105,468 |
MMBtu
|
$9.87 |
| TOTAL YEARLY COSTS | - | |||
| RECOMMENDED SAVINGS* | $256,760 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
| IMPLEMENTED SAVINGS* | $127,710 | |||
Recommendations
| # | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Electricity Demand Savings | Natural Gas Savings |
|---|---|---|---|---|---|---|---|
| 01 | 2.7496: Install partitions to reduce size of conditioned space | $41,910 | $32,000 | - | - |
$41,910
-
MMBtu
|
|
| 02 | 3.1161: Eliminate/reduce an operation | $40,620 | $4,000 |
$35,861
453,940
kWh
|
$4,759
-
kW-mo/yr
|
- | |
| 03 | 2.6218: Turn off equipment when not in use | $22,542 | $300 |
$22,542
285,345
kWh
|
- | - | |
| 04 | 2.4323: Use optimum size and capacity equipment | $20,904 | $300 |
$20,904
264,610
kWh
|
- | - | |
| 05 | 2.1243: Use heat from boiler blowdown to preheat boiler feed water | $20,819 | $37,000 | - | - |
$20,819
-
MMBtu
|
|
| 06 | 2.2314: Replace heat treating oven with more efficient unit | $12,436 | $15,000 | - | - |
$12,436
-
MMBtu
|
|
| 07 | 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves | $12,186 | $1,000 |
$10,758
136,183
kWh
|
$1,428
-
kW-mo/yr
|
- | |
| 08 | 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves | $9,349 | $6,200 |
$8,148
103,145
kWh
|
$1,201
-
kW-mo/yr
|
- | |
| 09 | 2.7261: Install timers and/or thermostats | $8,342 | $480 |
$8,342
105,600
kWh
|
- | - | |
| 10 | 2.3131: Reschedule plant operations or reduce load to avoid peaks | $5,672 | $2,500 | - |
$5,672
-
kW-mo/yr
|
- | |
| 11 | 2.6218: Turn off equipment when not in use | $1,980 | $510 |
$1,980
25,066
kWh
|
- | - | |
| 12 | 2.6121: Reduce hot water temperature to the minimum required | $60,000 | $100,000 | - | - |
$60,000
-
MMBtu
|
|
| TOTAL RECOMMENDED | $256,760 | $199,290 |
$108,535
1,373,889
kWh
|
$13,060
-
kW-mo/yr
|
$135,165
-
MMBtu
|
||
| TOTAL IMPLEMENTED | $127,710 | $76,800 |
$62,352
789,283
kWh
|
$2,629
-
kW-mo/yr
|
$62,729
-
MMBtu
|
||
| Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | Electricity Demand Savings | Natural Gas Savings | |||
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs