Assessment Year | 2005 |
---|---|
Principal Product | dry dog food |
NAICS | 311111: Dog and Cat Food Manufacturing |
SIC | 2047: Dog and Cat Food |
Sales Range | $100 M to 500M |
# of Employees | 90 |
Plant Area |
100,000
ft2
|
Annual Production | 150,000,000
lb
|
Production Hrs. Annual | 6,480
hrs
|
Location (State) | California |
Facility Energy Cost and Usage
Source | Yearly Cost | Usage | Unit Cost | |
---|---|---|---|---|
Electricity Usage | $717,813 | 9,766,364 |
kWh
|
$0.073 |
Electricity Demand | $225,085 | 21,672 |
kW-mo/yr
|
$10.39 |
Electricity Fees | $22,083 | - |
|
- |
TOTAL YEARLY COSTS | - | |||
RECOMMENDED SAVINGS* | $555,154 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
IMPLEMENTED SAVINGS* | $49,470 |
Recommendations
# | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Electricity Demand Savings | Natural Gas Savings | Primary Raw Material Savings | Primary Product Savings |
---|---|---|---|---|---|---|---|---|---|
01 | 2.4133: Use most efficient type of electric motors | $26,190 | $5,596 |
$24,763
192,533
kWh
|
$1,427
-
kW-mo/yr
|
- | - | - | |
02 | 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves | $11,585 | $175 |
$9,199
124,611
kWh
|
$2,386
-
kW-mo/yr
|
- | - | - | |
03 | 2.4231: Reduce the pressure of compressed air to the minimum required | $2,520 | - |
$2,001
27,102
kWh
|
$519
-
kW-mo/yr
|
- | - | - | |
04 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $49,470 | $72,000 |
$39,074
529,242
kWh
|
$10,396
-
kW-mo/yr
|
- | - | - | |
05 | 2.2136: Install / repair insulation on steam lines | $2,159 | $550 | - | - |
$2,159
-
MMBtu
|
- | - | |
06 | 2.2113: Repair or replace steam traps | $17,630 | $4,000 | - | - |
$17,630
-
MMBtu
|
- | - | |
07 | 4.625: Develop standard operating procedures | $4,950 | $1,500 | - | - | - | - | $4,950 | |
08 | 4.122: Develop standard procedures to improve internal yields | $440,650 | $1,500 |
$12,250
85,456
kWh
|
- | - | $393,750 | $34,650 | |
TOTAL RECOMMENDED | $555,154 | $85,321 |
$87,287
958,944
kWh
|
$14,728
-
kW-mo/yr
|
$19,789
-
MMBtu
|
$393,750 | $39,600 | ||
TOTAL IMPLEMENTED | $49,470 | $72,000 |
$39,074
529,242
kWh
|
$10,396
-
kW-mo/yr
|
- | - | - | ||
Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | Electricity Demand Savings | Natural Gas Savings | Primary Raw Material Savings | Primary Product Savings |
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs