ITAC Assessment: LM0103
ITAC logo
ITAC Assessment: LM0103
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2005
Principal Product dry dog food
NAICS 311111: Dog and Cat Food Manufacturing
SIC 2047: Dog and Cat Food
Sales Range $100
M
to 500
M
# of Employees 90
Plant Area 100,000
ft2
Annual Production 150,000,000
lb
Production Hrs. Annual 6,480
hrs
Location (State) California

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $717,813 9,766,364
kWh
Electricity Demand $225,085 21,672
kW-mo/yr
Electricity Fees $22,083 -
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $555,154 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $49,470

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Natural Gas Savings Primary Raw Material Savings Primary Product Savings
01 2.4133: Use most efficient type of electric motors $26,190 $5,596 $24,763
192,533
kWh
$1,427
-
kW-mo/yr
- - -
02 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $11,585 $175 $9,199
124,611
kWh
$2,386
-
kW-mo/yr
- - -
03 2.4231: Reduce the pressure of compressed air to the minimum required $2,520 - $2,001
27,102
kWh
$519
-
kW-mo/yr
- - -
04 2.7142: Utilize higher efficiency lamps and/or ballasts $49,470 $72,000 $39,074
529,242
kWh
$10,396
-
kW-mo/yr
- - -
05 2.2136: Install / repair insulation on steam lines $2,159 $550 - - $2,159
-
MMBtu
- -
06 2.2113: Repair or replace steam traps $17,630 $4,000 - - $17,630
-
MMBtu
- -
07 4.625: Develop standard operating procedures $4,950 $1,500 - - - - $4,950
08 4.122: Develop standard procedures to improve internal yields $440,650 $1,500 $12,250
85,456
kWh
- - $393,750 $34,650
TOTAL RECOMMENDED $555,154 $85,321 $87,287
958,944
kWh
$14,728
-
kW-mo/yr
$19,789
-
MMBtu
$393,750 $39,600
TOTAL IMPLEMENTED $49,470 $72,000 $39,074
529,242
kWh
$10,396
-
kW-mo/yr
- - -
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings Natural Gas Savings Primary Raw Material Savings Primary Product Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs