ITAC Assessment: UC2304
ITAC logo
ITAC Assessment: UC2304
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2023
Principal Product Steel frames
NAICS 332312: Fabricated Structural Metal Manufacturing
SIC 3441: Fabricated Structural Metal
Sales Range $50
M
to 100
M
# of Employees 61
Plant Area 125,000
ft2
Annual Production 8,000
ton
Production Hrs. Annual 2,000
hrs
Location (State) Connecticut

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $149,474 1,043,280
kWh
Electricity Demand $69,676 4,836
kW-mo/yr
Electricity Fees $16,064 -
Natural Gas $65,879 6,292
MMBtu
TOTAL YEARLY COSTS $301,094
RECOMMENDED SAVINGS* $145,575 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* -

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Natural Gas Savings Personnel Changes Savings Ancillary Material Cost Savings
01 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $1,182 $2,800 $831
5,800
kWh
$351
-
kW-mo/yr
- - -
02 2.7232: Replace existing hvac unit with high efficiency model $1,346 $16,122 $(-5,293.8)
(-36,950)
kWh
$(-729.5)
-
kW-mo/yr
$7,370
-
MMBtu
- -
03 2.7235: Install fossil fuel make-up air unit $38,532 $50,758 - - $38,532
-
MMBtu
- -
04 2.7493: Use double or triple glazed windows to maintain higher relative humidity and to reduce heat losses $17,250 $148,500 - - $17,250
-
MMBtu
- -
05 2.7447: Install vinyl strip / high speed / air curtain doors $4,740 $26,230 $(-1,697.6)
(-11,849)
kWh
$(-233.9)
-
kW-mo/yr
$6,672
-
MMBtu
- -
06 2.7142: Utilize higher efficiency lamps and/or ballasts $2,863 $2,882 $1,740
12,143
kWh
$1,050
-
kW-mo/yr
- $45 $28
07 2.7135: Install occupancy sensors $99 $260 $57
401
kWh
$35
-
kW-mo/yr
- $3 $4
08 2.9114: Use solar heat to make electricty $79,562 $411,323 $87,787
612,610
kWh
- - $(-8,225.0) -
TOTAL RECOMMENDED $145,575 $658,875 $83,424
582,155
kWh
$472
-
kW-mo/yr
$69,824
-
MMBtu
$(-8,177.0) $32
TOTAL IMPLEMENTED - - - - - - -
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings Natural Gas Savings Personnel Changes Savings Ancillary Material Cost Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs