Search Recommendations
ITAC logo
Search Recommendations
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

559

matching recommendations
$
$
ARC 2+ Digits Required
NAICS Animal food manufacturing
SIC 2+ Digits Required
3+ Characters Required for Products
ID Description Yearly
Savings
Imp
Cost
LE0253 #01 Y:2007 Install partitions to reduce size of conditioned space $41,910 $32,000
LM0120 #06 Y:2006 Modify workload $47,807 $1,000
LM0120 #05 Y:2006 Train operators for maximum operating efficiency $297,634 $6,380
LM0120 #04 Y:2006 Insulate bare equipment $20,043 $1,000
LM0120 #03 Y:2006 Increase amount of condensate returned $50,309 $1,000
LM0120 #02 Y:2006 Turn off equipment when not in use $4,118 -
LM0120 #01 Y:2006 Eliminate leaks in inert gas and compressed air lines/ valves $3,819 -
SF0328 #07 Y:2006 Use most efficient type of electric motors $346 $273
SF0328 #06 Y:2006 Utilize higher efficiency lamps and/or ballasts $2,841 $2,360
SF0328 #05 Y:2006 Utilize energy-efficient belts and other improved mechanisms $522 $298
SF0328 #04 Y:2006 Insulate bare equipment $2,821 $783
SF0328 #03 Y:2006 Reduce excessive boiler blowdown $2,038 $473
SF0328 #02 Y:2006 Eliminate leaks in inert gas and compressed air lines/ valves $1,420 -
SF0328 #01 Y:2006 Repair and eliminate steam leaks $4,864 -
SF0317 #08 Y:2005 Use adjustable frequency drive or multiple speed motors on existing system $1,189 $5,346
SF0317 #07 Y:2005 Use waste heat from hot flue gases to preheat $12,370 $50,000
SF0317 #06 Y:2005 Install occupancy sensors $1,140 $3,079
SF0317 #05 Y:2005 Utilize higher efficiency lamps and/or ballasts $187 $480
SF0317 #04 Y:2005 Install / repair insulation on steam lines $1,983 $1,979
SF0317 #03 Y:2005 Utilize energy-efficient belts and other improved mechanisms $1,170 $771