ITAC Assessment: LM0120
ITAC logo
ITAC Assessment: LM0120
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2006
Principal Product animal feed
NAICS 311119: Other Animal Food Manufacturing
SIC 2048: Prepared Feed and Feed Ingredients for Animals and Fowls, Except Dogs and Cats
Sales Range $100
M
to 500
M
# of Employees 200
Plant Area 175,100
ft2
Annual Production 1,000,000
ton
Production Hrs. Annual 8,760
hrs
Location (State) California

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $884,272 15,051,920
kWh
Electricity Demand $572,583 34,659
kW-mo/yr
Natural Gas $3,764,262 380,227
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $423,730 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $106,053

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Natural Gas Savings Administrative Changes Savings Ancillary Material Cost Savings Water Consumption Savings
01 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $3,819 - $3,302
37,521
kWh
$517
-
kW-mo/yr
- - - -
02 2.6218: Turn off equipment when not in use $4,118 - $1,868
27,980
kWh
- - - $2,250 -
03 2.2121: Increase amount of condensate returned $50,309 $1,000 - - $26,651
-
MMBtu
- $11,829 $11,829
-
Tgal
04 2.2511: Insulate bare equipment $20,043 $1,000 - - $20,043
-
MMBtu
- - -
05 4.431: Train operators for maximum operating efficiency $297,634 $6,380 $7,344
110
kWh
- - $290,290 - -
06 4.426: Modify workload $47,807 $1,000 $10,682
160,000
kWh
- $37,125
-
MMBtu
- - -
TOTAL RECOMMENDED $423,730 $9,380 $23,196
225,611
kWh
$517
-
kW-mo/yr
$83,819
-
MMBtu
$290,290 $14,079 $11,829
-
Tgal
TOTAL IMPLEMENTED $106,053 $2,000 $15,852
225,501
kWh
$517
-
kW-mo/yr
$63,776
-
MMBtu
- $14,079 $11,829
-
Tgal
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings Natural Gas Savings Administrative Changes Savings Ancillary Material Cost Savings Water Consumption Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs