10,025
matching recommendations| ID | # | Year | Description | Yearly Savings |
Implementation
Imp Cost |
Status |
|---|---|---|---|---|---|---|
| AM0513 #04 Y:2006 | 04 | 2006 | Repair and eliminate steam leaks | $49,600 | $5,000 | |
| AM0513 #03 Y:2006 | 03 | 2006 | Use waste heat from hot flue gases to preheat | $58,300 | $37,200 | |
| AM0513 #02 Y:2006 | 02 | 2006 | Analyze flue gas for proper air/fuel ratio | $80,500 | $76,300 | |
| AM0513 #01 Y:2006 | 01 | 2006 | Repair or replace steam traps | $103,300 | $4,900 | |
| OK0729 #05 Y:2006 | 05 | 2006 | Install / repair insulation on steam lines | $2,965 | $3,244 | |
| OK0729 #04 Y:2006 | 04 | 2006 | Utilize higher efficiency lamps and/or ballasts | $2,968 | $18,960 | |
| OK0729 #03 Y:2006 | 03 | 2006 | Use adjustable frequency drive or multiple speed motors on existing system | $2,820 | $3,090 | |
| OK0729 #02 Y:2006 | 02 | 2006 | Reduce the pressure of compressed air to the minimum required | $1,516 | $4,800 | |
| OK0729 #01 Y:2006 | 01 | 2006 | Preheat boiler makeup water with waste process heat | $9,248 | $15,150 | |
| IC0115 #09 Y:2006 | 09 | 2006 | Reduce excess steam bleeding | $29,262 | $5,000 | |
| IC0115 #08 Y:2006 | 08 | 2006 | Replace boiler | $125,042 | $193,200 | |
| IC0115 #07 Y:2006 | 07 | 2006 | Use or replace with energy efficient substitutes | $142,200 | $195,625 | |
| IC0115 #06 Y:2006 | 06 | 2006 | Install direct acting units in place of compressed air pressure system in safety system | $54 | $284 | |
| IC0115 #05 Y:2006 | 05 | 2006 | Utilize higher efficiency lamps and/or ballasts | $159 | $380 | |
| IC0115 #04 Y:2006 | 04 | 2006 | Utilize higher efficiency lamps and/or ballasts | $272 | $420 | |
| IC0115 #03 Y:2006 | 03 | 2006 | Utilize higher efficiency lamps and/or ballasts | $11,680 | $65,036 | |
| IC0115 #02 Y:2006 | 02 | 2006 | Use most efficient type of electric motors | $3,985 | $16,831 | |
| IC0115 #01 Y:2006 | 01 | 2006 | Utilize higher efficiency lamps and/or ballasts | $7,445 | $26,134 | |
| SF0329 #08 Y:2006 | 08 | 2006 | Utilize higher efficiency lamps and/or ballasts | $633 | $945 | |
| SF0329 #07 Y:2006 | 07 | 2006 | Utilize higher efficiency lamps and/or ballasts | $21,116 | $33,323 |