ITAC Assessment: LL0255
ITAC logo
ITAC Assessment: LL0255
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2006
Principal Product Chicken processing
NAICS 311615: Poultry Processing
SIC 2015: Poultry Slaughtering and Processing
Sales Range $50
M
to 100
M
# of Employees 150
Plant Area 150,000
ft2
Annual Production 1,000,000,000
pieces
Production Hrs. Annual 6,240
hrs
Location (State) Louisiana

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $678,312 11,422,466
kWh
Electricity Fees $25,080 -
Natural Gas $748,308 67,524
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $213,959 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $10,326

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Fees Savings Natural Gas Savings Personnel Changes Savings
01 2.2121: Increase amount of condensate returned $76,757 $77,280 - - $76,757
-
MMBtu
-
02 2.2441: Preheat boiler makeup water with waste process heat $72,962 $24,500 - - $72,962
-
MMBtu
-
03 2.2511: Insulate bare equipment $32,476 $8,296 $31,317
527,218
kWh
$1,159 - -
04 2.2135: Repair and eliminate steam leaks $16,453 $19,600 - - $16,453
-
MMBtu
-
05 2.4231: Reduce the pressure of compressed air to the minimum required $4,985 $30 $4,807
80,926
kWh
$178 - -
06 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $4,638 $1,520 $4,473
75,299
kWh
$165 - -
07 2.7135: Install occupancy sensors $3,853 $1,320 $3,716
62,557
kWh
$137 - -
08 2.7142: Utilize higher efficiency lamps and/or ballasts $844 $700 $163
2,742
kWh
$6 - $675
09 2.7111: Reduce illumination to minimum necessary levels $747 $69 $720
12,113
kWh
$27 - -
10 2.7134: Use photocell controls $244 $30 $235
3,963
kWh
$9 - -
TOTAL RECOMMENDED $213,959 $133,345 $45,431
764,818
kWh
$1,681 $166,172
-
MMBtu
$675
TOTAL IMPLEMENTED $10,326 $3,639 $9,307
156,674
kWh
$344 - $675
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Fees Savings Natural Gas Savings Personnel Changes Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs