Assessment Year | 2006 |
---|---|
Principal Product | Chicken processing |
NAICS | 311615: Poultry Processing |
SIC | 2015: Poultry Slaughtering and Processing |
Sales Range | $50 M to 100M |
# of Employees | 150 |
Plant Area |
150,000
ft2
|
Annual Production | 1,000,000,000
pieces
|
Production Hrs. Annual | 6,240
hrs
|
Location (State) | Louisiana |
Facility Energy Cost and Usage
Source | Yearly Cost | Usage | Unit Cost | |
---|---|---|---|---|
Electricity Usage | $678,312 | 11,422,466 |
kWh
|
$0.059 |
Electricity Fees | $25,080 | - |
|
- |
Natural Gas | $748,308 | 67,524 |
MMBtu
|
$11.08 |
TOTAL YEARLY COSTS | - | |||
RECOMMENDED SAVINGS* | $213,959 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
IMPLEMENTED SAVINGS* | $10,326 |
Recommendations
# | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Electricity Fees Savings | Natural Gas Savings | Personnel Changes Savings |
---|---|---|---|---|---|---|---|---|
01 | 2.2121: Increase amount of condensate returned | $76,757 | $77,280 | - | - |
$76,757
-
MMBtu
|
- | |
02 | 2.2441: Preheat boiler makeup water with waste process heat | $72,962 | $24,500 | - | - |
$72,962
-
MMBtu
|
- | |
03 | 2.2511: Insulate bare equipment | $32,476 | $8,296 |
$31,317
527,218
kWh
|
$1,159 | - | - | |
04 | 2.2135: Repair and eliminate steam leaks | $16,453 | $19,600 | - | - |
$16,453
-
MMBtu
|
- | |
05 | 2.4231: Reduce the pressure of compressed air to the minimum required | $4,985 | $30 |
$4,807
80,926
kWh
|
$178 | - | - | |
06 | 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves | $4,638 | $1,520 |
$4,473
75,299
kWh
|
$165 | - | - | |
07 | 2.7135: Install occupancy sensors | $3,853 | $1,320 |
$3,716
62,557
kWh
|
$137 | - | - | |
08 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $844 | $700 |
$163
2,742
kWh
|
$6 | - | $675 | |
09 | 2.7111: Reduce illumination to minimum necessary levels | $747 | $69 |
$720
12,113
kWh
|
$27 | - | - | |
10 | 2.7134: Use photocell controls | $244 | $30 |
$235
3,963
kWh
|
$9 | - | - | |
TOTAL RECOMMENDED | $213,959 | $133,345 |
$45,431
764,818
kWh
|
$1,681 |
$166,172
-
MMBtu
|
$675 | ||
TOTAL IMPLEMENTED | $10,326 | $3,639 |
$9,307
156,674
kWh
|
$344 | - | $675 | ||
Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | Electricity Fees Savings | Natural Gas Savings | Personnel Changes Savings |
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs