Assessment Year | 2006 |
---|---|
Principal Product | Milk Products |
NAICS | 311511: Fluid Milk Manufacturing |
SIC | 2026: Fluid Milk |
Sales Range | $10 M to 50M |
# of Employees | 100 |
Plant Area |
50,000
ft2
|
Annual Production | 170,000
lb
|
Production Hrs. Annual | 4,160
hrs
|
Location (State) | Oklahoma |
Facility Energy Cost and Usage
Source | Yearly Cost | Usage | Unit Cost | |
---|---|---|---|---|
Electricity Usage | $212,713 | 7,849,200 |
kWh
|
$0.027 |
Electricity Demand | $122,006 | 14,635 |
kW-mo/yr
|
$8.34 |
Natural Gas | $136,403 | 15,162 |
MMBtu
|
$9.00 |
TOTAL YEARLY COSTS | - | |||
RECOMMENDED SAVINGS* | $19,517 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
IMPLEMENTED SAVINGS* | - |
Recommendations
# | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Electricity Demand Savings | Natural Gas Savings |
---|---|---|---|---|---|---|---|
01 | 2.2441: Preheat boiler makeup water with waste process heat | $9,248 | $15,150 | - | - |
$9,248
-
MMBtu
|
|
02 | 2.4231: Reduce the pressure of compressed air to the minimum required | $1,516 | $4,800 |
$1,516
35,755
kWh
|
- | - | |
03 | 2.4146: Use adjustable frequency drive or multiple speed motors on existing system | $2,820 | $3,090 |
$2,820
66,499
kWh
|
- | - | |
04 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $2,968 | $18,960 |
$1,711
40,350
kWh
|
$1,257
-
kW-mo/yr
|
- | |
05 | 2.2136: Install / repair insulation on steam lines | $2,965 | $3,244 | - | - |
$2,965
-
MMBtu
|
|
TOTAL RECOMMENDED | $19,517 | $45,244 |
$6,047
142,604
kWh
|
$1,257
-
kW-mo/yr
|
$12,213
-
MMBtu
|
||
TOTAL IMPLEMENTED | - | - | - | - | - |
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs