| Assessment Year | 2006 |
|---|---|
| Principal Product | Milk Products |
| NAICS | 311511: Fluid Milk Manufacturing |
| SIC | 2026: Fluid Milk |
| Sales Range | $10 M to 50M |
| # of Employees | 100 |
| Plant Area |
50,000
ft2
|
| Annual Production | 170,000
lb
|
| Production Hrs. Annual | 4,160
hrs
|
| Location (State) | Oklahoma |
Facility Energy Cost and Usage
| Source | Yearly Cost | Usage | Unit Cost | |
|---|---|---|---|---|
| Electricity Usage | $212,713 | 7,849,200 |
kWh
|
$0.027 |
| Electricity Demand | $122,006 | 14,635 |
kW-mo/yr
|
$8.34 |
| Natural Gas | $136,403 | 15,162 |
MMBtu
|
$9.00 |
| TOTAL YEARLY COSTS | - | |||
| RECOMMENDED SAVINGS* | $19,517 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
| IMPLEMENTED SAVINGS* | - | |||
Recommendations
| # | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Electricity Demand Savings | Natural Gas Savings |
|---|---|---|---|---|---|---|---|
| 01 | 2.2441: Preheat boiler makeup water with waste process heat | $9,248 | $15,150 | - | - |
$9,248
-
MMBtu
|
|
| 02 | 2.4231: Reduce the pressure of compressed air to the minimum required | $1,516 | $4,800 |
$1,516
35,755
kWh
|
- | - | |
| 03 | 2.4146: Use adjustable frequency drive or multiple speed motors on existing system | $2,820 | $3,090 |
$2,820
66,499
kWh
|
- | - | |
| 04 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $2,968 | $18,960 |
$1,711
40,350
kWh
|
$1,257
-
kW-mo/yr
|
- | |
| 05 | 2.2136: Install / repair insulation on steam lines | $2,965 | $3,244 | - | - |
$2,965
-
MMBtu
|
|
| TOTAL RECOMMENDED | $19,517 | $45,244 |
$6,047
142,604
kWh
|
$1,257
-
kW-mo/yr
|
$12,213
-
MMBtu
|
||
| TOTAL IMPLEMENTED | - | - | - | - | - | ||
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs