Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2006
Principal Product Milk Products
NAICS 311511: Fluid Milk Manufacturing
SIC 2026: Fluid Milk
Sales Range $10
M
to 50
M
# of Employees 100
Plant Area 50,000
ft2
Annual Production 170,000
lb
Production Hrs. Annual 4,160
hrs
Location (State) Oklahoma

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $212,713 7,849,200
kWh
Electricity Demand $122,006 14,635
kW-mo/yr
Natural Gas $136,403 15,162
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $19,517 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* -

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Natural Gas Savings
01 2.2441: Preheat boiler makeup water with waste process heat $9,248 $15,150 - - $9,248
-
MMBtu
02 2.4231: Reduce the pressure of compressed air to the minimum required $1,516 $4,800 $1,516
35,755
kWh
- -
03 2.4146: Use adjustable frequency drive or multiple speed motors on existing system $2,820 $3,090 $2,820
66,499
kWh
- -
04 2.7142: Utilize higher efficiency lamps and/or ballasts $2,968 $18,960 $1,711
40,350
kWh
$1,257
-
kW-mo/yr
-
05 2.2136: Install / repair insulation on steam lines $2,965 $3,244 - - $2,965
-
MMBtu
TOTAL RECOMMENDED $19,517 $45,244 $6,047
142,604
kWh
$1,257
-
kW-mo/yr
$12,213
-
MMBtu
TOTAL IMPLEMENTED - - - - -
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs