| Assessment Year | 2006 |
|---|---|
| Principal Product | Poultry processing |
| NAICS | 311615: Poultry Processing |
| SIC | 2015: Poultry Slaughtering and Processing |
| Sales Range | $10 M to 50M |
| # of Employees | 529 |
| Plant Area |
252,000
ft2
|
| Annual Production | 62,400,000
pieces
|
| Production Hrs. Annual | 4,320
hrs
|
| Location (State) | Texas |
Facility Energy Cost and Usage
| Source | Yearly Cost | Usage | Unit Cost | |
|---|---|---|---|---|
| Electricity Usage | $1,082,324 | 20,455,500 |
kWh
|
$0.053 |
| Electricity Demand | $80,782 | 41,123 |
kW-mo/yr
|
$1.96 |
| Electricity Fees | $13,797 | - |
|
- |
| TOTAL YEARLY COSTS | - | |||
| RECOMMENDED SAVINGS* | $312,025 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
| IMPLEMENTED SAVINGS* | $305,855 | |||
Recommendations
| # | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Electricity Demand Savings | Natural Gas Savings | Ancillary Material Cost Savings |
|---|---|---|---|---|---|---|---|---|
| 01 | 2.2113: Repair or replace steam traps | $103,300 | $4,900 | - | - |
$103,300
-
MMBtu
|
- | |
| 02 | 2.1233: Analyze flue gas for proper air/fuel ratio | $80,500 | $76,300 | - | - |
$80,500
-
MMBtu
|
- | |
| 03 | 2.2414: Use waste heat from hot flue gases to preheat | $58,300 | $37,200 | - | - |
$58,300
-
MMBtu
|
- | |
| 04 | 2.2135: Repair and eliminate steam leaks | $49,600 | $5,000 | - | - |
$49,600
-
MMBtu
|
- | |
| 05 | 2.2511: Insulate bare equipment | $8,120 | $300 | - | - |
$8,120
-
MMBtu
|
- | |
| 06 | 2.4314: Use synthetic lubricant | $3,390 | - |
$3,060
51,102
kWh
|
$330
-
kW-mo/yr
|
- | - | |
| 07 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $2,780 | $290 |
$2,590
43,170
kWh
|
$190
-
kW-mo/yr
|
- | - | |
| 08 | 2.7124: Make a practice of turning off lights when not needed | $2,450 | - |
$2,450
41,000
kWh
|
- | - | - | |
| 09 | 2.7124: Make a practice of turning off lights when not needed | $2,170 | $144 |
$1,930
32,200
kWh
|
$240
-
kW-mo/yr
|
- | - | |
| 10 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $1,415 | $690 |
$265
4,415
kWh
|
$15
-
kW-mo/yr
|
- | $1,135 | |
| TOTAL RECOMMENDED | $312,025 | $124,824 |
$10,295
171,887
kWh
|
$775
-
kW-mo/yr
|
$299,820
-
MMBtu
|
$1,135 | ||
| TOTAL IMPLEMENTED | $305,855 | $124,534 |
$4,645
77,615
kWh
|
$255
-
kW-mo/yr
|
$299,820
-
MMBtu
|
$1,135 | ||
| Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | Electricity Demand Savings | Natural Gas Savings | Ancillary Material Cost Savings | |||
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs