96
matching recommendations| ID | # | Year | Description | Yearly Savings |
Implementation
Imp Cost |
Status |
|---|---|---|---|---|---|---|
| MS0413 #05 Y:2023 | 05 | 2023 | Insulate bare equipment | $11,256 | $11,275 | |
| MS0413 #04 Y:2023 | 04 | 2023 | Eliminate leaks in inert gas and compressed air lines/ valves | $1,019 | $1,523 | |
| MS0413 #03 Y:2023 | 03 | 2023 | Use solar heat to make electricty | $35,830 | $456,750 | |
| MS0413 #02 Y:2023 | 02 | 2023 | Replace existing hvac unit with high efficiency model | $1,194 | $17,530 | |
| MS0413 #01 Y:2023 | 01 | 2023 | Install occupancy sensors | $225 | $341 | |
| MS0402 #03 Y:2022 | 03 | 2022 | Insulate bare equipment | $1,180 | $2,290 | |
| MS0402 #02 Y:2022 | 02 | 2022 | Use most efficient type of electric motors | $7,486 | $20,845 | |
| MS0402 #01 Y:2022 | 01 | 2022 | Optimize plant power factor | $1,171 | $3,039 | |
| UA0137 #06 Y:2015 | 06 | 2015 | Install / repair insulation on steam lines | $136 | $57 | |
| UA0137 #05 Y:2015 | 05 | 2015 | Reduce the pressure of compressed air to the minimum required | $5,122 | $800 | |
| UA0137 #04 Y:2015 | 04 | 2015 | Recover waste heat from equipment | $15,099 | $2,441 | |
| UA0137 #03 Y:2015 | 03 | 2015 | Eliminate leaks in inert gas and compressed air lines/ valves | $12,499 | $4,495 | |
| UA0137 #02 Y:2015 | 02 | 2015 | Install timers and/or thermostats | $234 | - | |
| UA0137 #01 Y:2015 | 01 | 2015 | Turn off equipment when not in use | $26,242 | - | |
| AM0668 #06 Y:2014 | 06 | 2014 | Utilize energy-efficient belts and other improved mechanisms | $450 | $60 | |
| AM0668 #05 Y:2014 | 05 | 2014 | Make a practice of turning off lights when not needed | $1,110 | - | |
| AM0668 #04 Y:2014 | 04 | 2014 | Reduce the pressure of compressed air to the minimum required | $4,820 | $9 | |
| AM0668 #03 Y:2014 | 03 | 2014 | Use most efficient type of electric motors | $4,840 | $33,524 | |
| AM0668 #02 Y:2014 | 02 | 2014 | Eliminate leaks in inert gas and compressed air lines/ valves | $15,250 | $2,500 | |
| AM0668 #01 Y:2014 | 01 | 2014 | Use or replace with energy efficient substitutes | $48,700 | $3,340 |