ITAC Assessment: MS0413
ITAC logo
ITAC Assessment: MS0413
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2023
Principal Product Wafer cookies
NAICS 311821: Cookie and Cracker Manufacturing
SIC 2052: Cookies and Crackers
Sales Range $10
M
to 50
M
# of Employees 200
Plant Area 105,000
ft2
Annual Production 200,000,000
units
Production Hrs. Annual 6,336
hrs
Location (State) Mississippi

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $191,403 3,415,760
kWh
Electricity Demand $45,279 7,524
kW-mo/yr
Electricity Fees $66,328 -
Natural Gas $257,242 31,920
MMBtu
Waste Disposal Costs
Water Usage $6,509 1,893
Tgal
Water Disposal $4,225 1,893
Tgal
TOTAL YEARLY COSTS $570,986
RECOMMENDED SAVINGS* $49,524 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* -

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings
01 2.7135: Install occupancy sensors $225 $341 $225
4,024
kWh
-
02 2.7232: Replace existing hvac unit with high efficiency model $1,194 $17,530 $1,165
20,807
kWh
$29
-
kW-mo/yr
03 2.9114: Use solar heat to make electricty $35,830 $456,750 $35,830
639,825
kWh
-
04 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $1,019 $1,523 $1,019
18,192
kWh
-
05 2.2511: Insulate bare equipment $11,256 $11,275 $11,256
200,991
kWh
-
TOTAL RECOMMENDED $49,524 $487,419 $49,495
883,839
kWh
$29
-
kW-mo/yr
TOTAL IMPLEMENTED - - - -
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs