ITAC Assessment: UD1033
ITAC logo
ITAC Assessment: UD1033
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2022
Principal Product Machining
NAICS 332710: Machine Shops
SIC 3599: Industrial and Commercial Machinery and Equipment, Not Elsewhere Classified
Sales Range $5
M
to 10
M
# of Employees 50
Plant Area 22,500
ft2
Annual Production 125,500
units
Production Hrs. Annual 6,240
hrs
Location (State) Ohio

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $41,706 1,062,581
kWh
Electricity Demand $17,162 2,349
kW-mo/yr
Electricity Fees $13,799 -
Natural Gas $3,872 503
MMBtu
Waste Disposal Costs
Water Usage $2,011 322
Tgal
Water Disposal $2,128 322
Tgal
TOTAL YEARLY COSTS $80,678
RECOMMENDED SAVINGS* $15,462 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $5,955

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Personnel Changes Savings Primary Raw Material Savings
01 2.7425: Clean or color roof to reduce solar load $633 - $504
12,839
kWh
$129
-
kW-mo/yr
- -
02 2.4231: Reduce the pressure of compressed air to the minimum required $2,185 $2,250 $428
10,905
kWh
$1,757
-
kW-mo/yr
- -
03 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $555 $676 $442
11,251
kWh
$113
-
kW-mo/yr
- -
04 2.7142: Utilize higher efficiency lamps and/or ballasts $5,955 $6,000 $3,875
98,736
kWh
$1,326
-
kW-mo/yr
$431 $323
05 2.7135: Install occupancy sensors $2,775 $800 $1,147
29,213
kWh
$867
-
kW-mo/yr
$609 $152
06 2.7241: Install outside air damper / economizer on hvac unit $3,359 $4,615 $3,359
85,574
kWh
- - -
TOTAL RECOMMENDED $15,462 $14,341 $9,755
248,518
kWh
$4,192
-
kW-mo/yr
$1,040 $475
TOTAL IMPLEMENTED $5,955 $6,000 $3,875
98,736
kWh
$1,326
-
kW-mo/yr
$431 $323
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings Personnel Changes Savings Primary Raw Material Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs