ITAC Assessment: UA0137
ITAC logo
ITAC Assessment: UA0137
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2015
Principal Product Bread and Rolls
NAICS 311812: Commercial Bakeries
SIC 2051: Bread and Other Bakery Products, Except Cookies and Crackers
Sales Range $10
M
to 50
M
# of Employees 184
Plant Area 90,144
ft2
Annual Production 84,891,086
lb
Production Hrs. Annual 8,424
hrs
Location (State) Mississippi

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $656,017 9,827,636
kWh
Electricity Demand $162,739 18,164
kW-mo/yr
Electricity Fees $29,159 -
Natural Gas $314,509 61,045
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $59,332 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $59,332

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Electricity Fees Savings Natural Gas Savings
01 2.6218: Turn off equipment when not in use $26,242 - $18,396
275,590
kWh
$7,526
-
kW-mo/yr
$320 -
02 2.7261: Install timers and/or thermostats $234 - $230
3,451
kWh
- $4 -
03 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $12,499 $4,495 $10,103
151,363
kWh
$2,182
-
kW-mo/yr
$214 -
04 2.2437: Recover waste heat from equipment $15,099 $2,441 $10,818
162,073
kWh
$4,023
-
kW-mo/yr
$258 -
05 2.4231: Reduce the pressure of compressed air to the minimum required $5,122 $800 $3,690
55,279
kWh
$1,344
-
kW-mo/yr
$88 -
06 2.2136: Install / repair insulation on steam lines $136 $57 - - - $136
-
MMBtu
TOTAL RECOMMENDED $59,332 $7,793 $43,237
647,756
kWh
$15,075
-
kW-mo/yr
$884 $136
-
MMBtu
TOTAL IMPLEMENTED $59,332 $7,793 $43,237
647,756
kWh
$15,075
-
kW-mo/yr
$884 $136
-
MMBtu
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings Electricity Fees Savings Natural Gas Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs