ITAC Assessment: WV0430
ITAC logo
ITAC Assessment: WV0430
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2011
Principal Product interior design display walls
NAICS 321918: Other Millwork (including Flooring)
SIC 2431: Millwork
Sales Range $10
M
to 50
M
# of Employees 185
Plant Area 320,000
ft2
Annual Production 40,000,000
units
Production Hrs. Annual 4,030
hrs
Location (State) Ohio

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $725,123 7,496,141
kWh
Natural Gas $479,871 57,530
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $280,817 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $98,084

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Fees Savings Natural Gas Savings Personnel Changes Savings Administrative Changes Savings
01 2.6231: Utilize controls to operate equipment only when needed $70,581 $20,000 - - $70,581
-
MMBtu
- -
02 2.1233: Analyze flue gas for proper air/fuel ratio $43,659 $3,500 - - $44,019
-
MMBtu
$(-360.0) -
03 2.7231: Use radiant heater for spot heating $39,290 $65,840 - - $39,290
-
MMBtu
- -
04 2.4224: Upgrade controls on compressors $34,733 $26,650 $34,733
358,070
kWh
- - - -
05 2.6127: Maintain air filters by cleaning or replacement $28,475 $76,200 $(-2,036.0)
(-21,046)
kWh
- $34,511
-
MMBtu
- $(-4,000.0)
06 2.3212: Optimize plant power factor $25,696 $37,805 - - - - $25,696
07 2.7142: Utilize higher efficiency lamps and/or ballasts $19,692 $37,460 $19,692
203,015
kWh
- - - -
08 2.8112: Combine utility meters $10,426 $20,000 - $10,426 - - -
09 2.7444: Close holes and openings in building such as broken windows $8,265 $57,400 - - $8,265
-
MMBtu
- -
TOTAL RECOMMENDED $280,817 $344,855 $52,389
540,039
kWh
$10,426 $196,666
-
MMBtu
$(-360.0) $21,696
TOTAL IMPLEMENTED $98,084 $67,610 $54,425
561,085
kWh
- $44,019
-
MMBtu
$(-360.0) -
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Fees Savings Natural Gas Savings Personnel Changes Savings Administrative Changes Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs