| Assessment Year | 2011 |
|---|---|
| Principal Product | interior design display walls |
| NAICS | 321918: Other Millwork (including Flooring) |
| SIC | 2431: Millwork |
| Sales Range | $10 M to 50M |
| # of Employees | 185 |
| Plant Area |
320,000
ft2
|
| Annual Production | 40,000,000
units
|
| Production Hrs. Annual | 4,030
hrs
|
| Location (State) | Ohio |
Facility Energy Cost and Usage
| Source | Yearly Cost | Usage | Unit Cost | |
|---|---|---|---|---|
| Electricity Usage | $725,123 | 7,496,141 |
kWh
|
$0.097 |
| Natural Gas | $479,871 | 57,530 |
MMBtu
|
$8.34 |
| TOTAL YEARLY COSTS | - | |||
| RECOMMENDED SAVINGS* | $280,817 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
| IMPLEMENTED SAVINGS* | $98,084 | |||
Recommendations
| # | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Electricity Fees Savings | Natural Gas Savings | Personnel Changes Savings | Administrative Changes Savings |
|---|---|---|---|---|---|---|---|---|---|
| 01 | 2.6231: Utilize controls to operate equipment only when needed | $70,581 | $20,000 | - | - |
$70,581
-
MMBtu
|
- | - | |
| 02 | 2.1233: Analyze flue gas for proper air/fuel ratio | $43,659 | $3,500 | - | - |
$44,019
-
MMBtu
|
$(-360.0) | - | |
| 03 | 2.7231: Use radiant heater for spot heating | $39,290 | $65,840 | - | - |
$39,290
-
MMBtu
|
- | - | |
| 04 | 2.4224: Upgrade controls on compressors | $34,733 | $26,650 |
$34,733
358,070
kWh
|
- | - | - | - | |
| 05 | 2.6127: Maintain air filters by cleaning or replacement | $28,475 | $76,200 |
$(-2,036.0)
(-21,046)
kWh
|
- |
$34,511
-
MMBtu
|
- | $(-4,000.0) | |
| 06 | 2.3212: Optimize plant power factor | $25,696 | $37,805 | - | - | - | - | $25,696 | |
| 07 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $19,692 | $37,460 |
$19,692
203,015
kWh
|
- | - | - | - | |
| 08 | 2.8112: Combine utility meters | $10,426 | $20,000 | - | $10,426 | - | - | - | |
| 09 | 2.7444: Close holes and openings in building such as broken windows | $8,265 | $57,400 | - | - |
$8,265
-
MMBtu
|
- | - | |
| TOTAL RECOMMENDED | $280,817 | $344,855 |
$52,389
540,039
kWh
|
$10,426 |
$196,666
-
MMBtu
|
$(-360.0) | $21,696 | ||
| TOTAL IMPLEMENTED | $98,084 | $67,610 |
$54,425
561,085
kWh
|
- |
$44,019
-
MMBtu
|
$(-360.0) | - | ||
| Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | Electricity Fees Savings | Natural Gas Savings | Personnel Changes Savings | Administrative Changes Savings | |||
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs