Assessment Year | 2018 |
---|---|
Principal Product | Flower Arrangements |
NAICS | 339999: All Other Miscellaneous Manufacturing |
SIC | 3999: Manufacturing Industries, Not Elsewhere Classified |
Sales Range | $1 M to 5M |
# of Employees | 272 |
Plant Area |
105,000
ft2
|
Annual Production | 3,900,000
units
|
Production Hrs. Annual | 2,496
hrs
|
Location (State) | Florida |
Facility Energy Cost and Usage
Source | Yearly Cost | Usage | Unit Cost | ||
---|---|---|---|---|---|
Electricity Usage | $135,854 | 2,668,380 |
kWh
|
$0.051 | |
Electricity Demand | $63,362 | 5,986 |
kW-mo/yr
|
$10.59 | |
Electricity Fees | $47,911 | - |
|
- | |
Waste Disposal Costs | |||||
Solid Waste (non-haz) | $61,522 | 809,000 |
lb
|
$0.076 | |
TOTAL YEARLY COSTS | $308,649 | ||||
RECOMMENDED SAVINGS* | $98,564 |
See individual recommendations below
*Non-energy impacts included in savings.
|
|||
IMPLEMENTED SAVINGS* | $89,564 |
Recommendations
# | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Electricity Demand Savings | Solid Waste (non-haz) Savings | Administrative Changes Savings |
---|---|---|---|---|---|---|---|---|
01 | 3.5313: Increase amount of waste recovered for resale | $36,913 | $46,280 | - | - |
$36,913
-
lb
|
- | |
02 | 2.7496: Install partitions to reduce size of conditioned space | $23,527 | $28,760 |
$16,806
330,171
kWh
|
$6,721
-
kW-mo/yr
|
- | - | |
03 | 2.2628: Utilize a less expensive cooling method | $10,537 | $28,750 |
$4,405
86,548
kWh
|
$2,932
-
kW-mo/yr
|
- | $3,200 | |
04 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $9,000 | $34,806 |
$4,450
87,425
kWh
|
$4,550
-
kW-mo/yr
|
- | - | |
05 | 2.7221: Lower temperature during the winter season and vice-versa | $7,275 | $120 |
$5,321
104,529
kWh
|
$1,954
-
kW-mo/yr
|
- | - | |
06 | 2.7496: Install partitions to reduce size of conditioned space | $5,470 | $15,860 |
$5,470
107,462
kWh
|
- | - | - | |
07 | 2.7447: Install vinyl strip / high speed / air curtain doors | $4,837 | $701 |
$3,768
74,022
kWh
|
$1,069
-
kW-mo/yr
|
- | - | |
08 | 2.7135: Install occupancy sensors | $1,005 | $508 |
$1,005
19,753
kWh
|
- | - | - | |
TOTAL RECOMMENDED | $98,564 | $155,785 |
$41,225
809,910
kWh
|
$17,226
-
kW-mo/yr
|
$36,913
-
lb
|
$3,200 | ||
TOTAL IMPLEMENTED | $89,564 | $120,979 |
$36,775
722,485
kWh
|
$12,676
-
kW-mo/yr
|
$36,913
-
lb
|
$3,200 | ||
Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | Electricity Demand Savings | Solid Waste (non-haz) Savings | Administrative Changes Savings |
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs