ITAC Assessment: MI0326
ITAC logo
ITAC Assessment: MI0326
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2018
Principal Product Flower Arrangements
NAICS 339999: All Other Miscellaneous Manufacturing
SIC 3999: Manufacturing Industries, Not Elsewhere Classified
Sales Range $1
M
to 5
M
# of Employees 272
Plant Area 105,000
ft2
Annual Production 3,900,000
units
Production Hrs. Annual 2,496
hrs
Location (State) Florida

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $135,854 2,668,380
kWh
Electricity Demand $63,362 5,986
kW-mo/yr
Electricity Fees $47,911 -
Waste Disposal Costs
Solid Waste (non-haz) $61,522 809,000
lb
TOTAL YEARLY COSTS $308,649
RECOMMENDED SAVINGS* $98,564 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $89,564

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Solid Waste (non-haz) Savings Administrative Changes Savings
01 3.5313: Increase amount of waste recovered for resale $36,913 $46,280 - - $36,913
-
lb
-
02 2.7496: Install partitions to reduce size of conditioned space $23,527 $28,760 $16,806
330,171
kWh
$6,721
-
kW-mo/yr
- -
03 2.2628: Utilize a less expensive cooling method $10,537 $28,750 $4,405
86,548
kWh
$2,932
-
kW-mo/yr
- $3,200
04 2.7142: Utilize higher efficiency lamps and/or ballasts $9,000 $34,806 $4,450
87,425
kWh
$4,550
-
kW-mo/yr
- -
05 2.7221: Lower temperature during the winter season and vice-versa $7,275 $120 $5,321
104,529
kWh
$1,954
-
kW-mo/yr
- -
06 2.7496: Install partitions to reduce size of conditioned space $5,470 $15,860 $5,470
107,462
kWh
- - -
07 2.7447: Install vinyl strip / high speed / air curtain doors $4,837 $701 $3,768
74,022
kWh
$1,069
-
kW-mo/yr
- -
08 2.7135: Install occupancy sensors $1,005 $508 $1,005
19,753
kWh
- - -
TOTAL RECOMMENDED $98,564 $155,785 $41,225
809,910
kWh
$17,226
-
kW-mo/yr
$36,913
-
lb
$3,200
TOTAL IMPLEMENTED $89,564 $120,979 $36,775
722,485
kWh
$12,676
-
kW-mo/yr
$36,913
-
lb
$3,200
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings Solid Waste (non-haz) Savings Administrative Changes Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs