| Assessment Year | 2025 |
|---|---|
| Principal Product | Treated Wastewater |
| NAICS | 221320: Sewage Treatment Facilities |
| SIC | 4952: Sewerage Systems |
| Sales Range | $5 M to 10M |
| # of Employees | 7 |
| Plant Area |
112,214
ft2
|
| Annual Production | 1,314,000
Tgal
|
| Production Hrs. Annual | 8,760
hrs
|
| Location (State) | Nebraska |
Facility Energy Cost and Usage
| Source | Yearly Cost | Usage | Unit Cost | |
|---|---|---|---|---|
| Electricity Usage | $137,626 | 2,928,220 |
kWh
|
$0.047 |
| Electricity Demand | $56,702 | 3,544 |
kW-mo/yr
|
$16.00 |
| Electricity Fees | $8,663 | - |
|
- |
| Natural Gas | $37,274 | 4,641 |
MMBtu
|
$8.03 |
| Other Gas | $1,492 | 1 |
MMBtu
|
$1,492.00 |
| TOTAL YEARLY COSTS | $241,757 | |||
| RECOMMENDED SAVINGS* | $20,431 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
| IMPLEMENTED SAVINGS* | - | |||
Recommendations
| # | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Electricity Demand Savings | Natural Gas Savings | Personnel Changes Savings |
|---|---|---|---|---|---|---|---|---|
| 01 | 2.4146: Use adjustable frequency drive or multiple speed motors on existing system | $16,056 | $9,000 |
$22,385
476,271
kWh
|
$3,031
-
kW-mo/yr
|
- | $(-9,360.0) | |
| 02 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $2,394 | $5,536 |
$889
18,922
kWh
|
$832
-
kW-mo/yr
|
- | $673 | |
| 03 | 2.3191: Use demand controller or load shedder | $1,312 | $960 | - |
$1,312
-
kW-mo/yr
|
- | - | |
| 04 | 2.7492: Use proper thickness of insulation on building envelope | $432 | $2,440 | - | - |
$432
-
MMBtu
|
- | |
| 05 | 2.4111: Utilize energy-efficient belts and other improved mechanisms | $185 | $240 |
$126
2,673
kWh
|
$59
-
kW-mo/yr
|
- | - | |
| 06 | 2.7134: Use photocell controls | $52 | $76 |
$52
1,095
kWh
|
- | - | - | |
| TOTAL RECOMMENDED | $20,431 | $18,252 |
$23,452
498,961
kWh
|
$5,234
-
kW-mo/yr
|
$432
-
MMBtu
|
$(-8,687.0) | ||
| TOTAL IMPLEMENTED | - | - | - | - | - | - | ||
| Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | Electricity Demand Savings | Natural Gas Savings | Personnel Changes Savings | |||
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs