Search Recommendations
ITAC logo
Search Recommendations
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

33

matching recommendations
$
$
ARC 2+ Digits Required
NAICS Steam and air-conditioning supply
SIC 2+ Digits Required
3+ Characters Required for Products
ID Description Yearly
Savings
Imp
Cost
CM1001 #05 Y:2022 Minimize water usage $1,100 $3,300
CM1001 #04 Y:2022 Utilize higher efficiency lamps and/or ballasts $480 $3,950
CM1001 #03 Y:2022 Insulate bare equipment $190 $1,100
CM1001 #02 Y:2022 Recover heat from exhausted steam, hot air or hot water $2,550 $24,900
CM1001 #01 Y:2022 Eliminate or reduce compressed air usage $5,400 $14,000
UU0174 #05 Y:2020 Utilize energy-efficient belts and other improved mechanisms $476 $1,925
UU0174 #04 Y:2020 Reduce the pressure of compressed air to the minimum required $744 $200
UU0174 #03 Y:2020 Install occupancy sensors $5,107 $43,420
UU0174 #02 Y:2020 Utilize higher efficiency lamps and/or ballasts $18,383 $85,347
UU0174 #01 Y:2020 Install smaller boiler (increase high fire duty cycle) $24,060 $178,852
UU0162 #04 Y:2019 Modify refrigeration system to operate at a lower pressure $328 $1,141
UU0162 #03 Y:2019 Use adjustable frequency drive or multiple speed motors on existing system $4,096 $5,759
UU0162 #02 Y:2019 Upgrade obsolete equipment $5,390 $7,024
UU0162 #01 Y:2019 Reduce fluid flow rates $8,259 $17,871
OR0707 #06 Y:2018 Improve combustion control capability $1,431 $5,365
OR0707 #05 Y:2018 Utilize higher efficiency lamps and/or ballasts $2,481 $19,583
OR0707 #04 Y:2018 Reduce fluid flow rates $6,509 $7,384
OR0707 #03 Y:2018 Insulate bare equipment $7,954 $8,965
OR0707 #02 Y:2018 Use waste heat from hot flue gases to preheat $14,884 $53,702
OR0707 #01 Y:2018 Use adjustable frequency drive or multiple speed motors on existing system $23,086 $32,488