| Assessment Year | 2020 |
|---|---|
| Principal Product | Chilled Water |
| NAICS | 221330: Steam and Air-Conditioning Supply |
| SIC | 8221: Colleges, Universities, and Professional Schools |
| Sales Range | $1 M to 5M |
| # of Employees | 35 |
| Plant Area |
60,000
ft2
|
| Annual Production | 2,031
Tgal
|
| Production Hrs. Annual | 8,760
hrs
|
| Location (State) | Utah |
Facility Energy Cost and Usage
| Source | Yearly Cost | Usage | Unit Cost | ||
|---|---|---|---|---|---|
| Electricity Usage | $396,832 | 6,613,871 |
kWh
|
$0.060 | |
| Waste Disposal Costs | |||||
| Water Usage | $43,611 | 2,030,690 |
Tgal
|
$0.021 | |
| TOTAL YEARLY COSTS | $440,443 | ||||
| RECOMMENDED SAVINGS* | $18,073 |
See individual recommendations below
*Non-energy impacts included in savings.
|
|||
| IMPLEMENTED SAVINGS* | $12,683 | ||||
Recommendations
| # | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings |
|---|---|---|---|---|---|
| 01 | 2.5123: Reduce fluid flow rates | $8,259 | $17,871 |
$8,259
137,661
kWh
|
|
| 02 | 2.4321: Upgrade obsolete equipment | $5,390 | $7,024 |
$5,390
89,940
kWh
|
|
| 03 | 2.4146: Use adjustable frequency drive or multiple speed motors on existing system | $4,096 | $5,759 |
$4,096
68,270
kWh
|
|
| 04 | 2.2621: Modify refrigeration system to operate at a lower pressure | $328 | $1,141 |
$328
5,463
kWh
|
|
| TOTAL RECOMMENDED | $18,073 | $31,795 |
$18,073
301,334
kWh
|
||
| TOTAL IMPLEMENTED | $12,683 | $24,771 |
$12,683
211,394
kWh
|
||
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs