ITAC Assessment: UU0162
ITAC logo
ITAC Assessment: UU0162
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2020
Principal Product Chilled Water
NAICS 221330: Steam and Air-Conditioning Supply
SIC 8221: Colleges, Universities, and Professional Schools
Sales Range $1
M
to 5
M
# of Employees 35
Plant Area 60,000
ft2
Annual Production 2,031
Tgal
Production Hrs. Annual 8,760
hrs
Location (State) Utah

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $396,832 6,613,871
kWh
Waste Disposal Costs
Water Usage $43,611 2,030,690
Tgal
TOTAL YEARLY COSTS $440,443
RECOMMENDED SAVINGS* $18,073 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $12,683

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings
01 2.5123: Reduce fluid flow rates $8,259 $17,871 $8,259
137,661
kWh
02 2.4321: Upgrade obsolete equipment $5,390 $7,024 $5,390
89,940
kWh
03 2.4146: Use adjustable frequency drive or multiple speed motors on existing system $4,096 $5,759 $4,096
68,270
kWh
04 2.2621: Modify refrigeration system to operate at a lower pressure $328 $1,141 $328
5,463
kWh
TOTAL RECOMMENDED $18,073 $31,795 $18,073
301,334
kWh
TOTAL IMPLEMENTED $12,683 $24,771 $12,683
211,394
kWh
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs