Assessment Year | 2004 |
---|---|
Principal Product | croutons |
NAICS | 311821: Cookie and Cracker Manufacturing |
SIC | 2052: Cookies and Crackers |
Sales Range | $50 M to 100M |
# of Employees | 125 |
Plant Area |
200,000
ft2
|
Annual Production | 33,000,000
lb
|
Production Hrs. Annual | 4,680
hrs
|
Location (State) | California |
Facility Energy Cost and Usage
Source | Yearly Cost | Usage | Unit Cost | |
---|---|---|---|---|
Electricity Usage | $193,360 | 1,803,923 |
kWh
|
$0.11 |
Electricity Demand | $32,966 | 4,032 |
kW-mo/yr
|
$8.18 |
Electricity Fees | $3,856 | - |
|
- |
Natural Gas | $252,201 | 39,776 |
MMBtu
|
$6.34 |
TOTAL YEARLY COSTS | - | |||
RECOMMENDED SAVINGS* | $28,291 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
IMPLEMENTED SAVINGS* | - |
Recommendations
# | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Electricity Demand Savings | Natural Gas Savings | Personnel Changes Savings |
---|---|---|---|---|---|---|---|---|
01 | 2.2511: Insulate bare equipment | $13,838 | $26,170 | n/a | - | - |
$13,838
-
MMBtu
|
- |
02 | 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves | $474 | $65 | n/a |
$402
3,720
kWh
|
$72
-
kW-mo/yr
|
- | - |
03 | 2.4133: Use most efficient type of electric motors | $123 | $169 | n/a |
$88
1,343
kWh
|
$35
-
kW-mo/yr
|
- | - |
04 | 4.432: Cross-train personnel to avoid lost time | $13,000 | $5,400 | n/a | - | - | - | $13,000 |
05 | 2.4231: Reduce the pressure of compressed air to the minimum required | $856 | - | n/a |
$718
6,660
kWh
|
$138
-
kW-mo/yr
|
- | - |
TOTAL RECOMMENDED | $28,291 | $31,804 |
$1,208
11,723
kWh
|
$245
-
kW-mo/yr
|
$13,838
-
MMBtu
|
$13,000 | ||
TOTAL IMPLEMENTED | - | - | - | - | - | - |
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs