ITAC Assessment: UU0174
ITAC logo
ITAC Assessment: UU0174
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2021
Principal Product High Temperature Hot Water
NAICS 221330: Steam and Air-Conditioning Supply
SIC 8221: Colleges, Universities, and Professional Schools
Sales Range $1
M
to 5
M
# of Employees 750
Plant Area 186,185
ft2
Annual Production 17,071
units
Production Hrs. Annual 8,760
hrs
Location (State) Utah

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $279,307 4,467,242
kWh
Other Energy $155,416 17,071
MMBtu
Waste Disposal Costs
Water Usage $23,263 7,318
Tgal
TOTAL YEARLY COSTS $457,987
RECOMMENDED SAVINGS* $48,770 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $43,187

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Administrative Changes Savings
01 2.1223: Install smaller boiler (increase high fire duty cycle) $24,060 $178,852 - $24,060
02 2.7142: Utilize higher efficiency lamps and/or ballasts $18,383 $85,347 $18,383
291,792
kWh
-
03 2.7135: Install occupancy sensors $5,107 $43,420 $5,107
81,061
kWh
-
04 2.4231: Reduce the pressure of compressed air to the minimum required $744 $200 $744
11,896
kWh
-
05 2.4111: Utilize energy-efficient belts and other improved mechanisms $476 $1,925 $476
7,621
kWh
-
TOTAL RECOMMENDED $48,770 $309,744 $24,710
392,370
kWh
$24,060
TOTAL IMPLEMENTED $43,187 $264,399 $19,127
303,688
kWh
$24,060
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs