ITAC Assessment: OR0707
ITAC logo
ITAC Assessment: OR0707
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2018
Principal Product Water
NAICS 221330: Steam and Air-Conditioning Supply
SIC 4961: Steam and Air-Conditioning Supply
Sales Range $1
M
to 5
M
# of Employees 36
Plant Area 7,000
ft2
Annual Production 12,000
Tgal
Production Hrs. Annual 8,760
hrs
Location (State) Oregon

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $2,156,311 37,830,013
kWh
Electricity Demand $158,608 61,003
kW-mo/yr
Electricity Fees $(-1,869,325.0) -
Natural Gas $786,893 378,894
MMBtu
Waste Disposal Costs
Water Usage $264,588 37,801
Tgal
TOTAL YEARLY COSTS $1,497,075
RECOMMENDED SAVINGS* $56,345 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $33,259

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Natural Gas Savings Personnel Changes Savings Ancillary Material Cost Savings
01 2.4146: Use adjustable frequency drive or multiple speed motors on existing system $23,086 $32,488 $21,780
382,114
kWh
$1,306
-
kW-mo/yr
- - -
02 2.2414: Use waste heat from hot flue gases to preheat $14,884 $53,702 - - $14,884
-
MMBtu
- -
03 2.2511: Insulate bare equipment $7,954 $8,965 - - $7,954
-
MMBtu
- -
04 2.5123: Reduce fluid flow rates $6,509 $7,384 $6,008
105,412
kWh
$501
-
kW-mo/yr
- - -
05 2.7142: Utilize higher efficiency lamps and/or ballasts $2,481 $19,583 $1,782
31,269
kWh
$111
-
kW-mo/yr
- $739 $(-151.0)
06 2.1116: Improve combustion control capability $1,431 $5,365 $1,301
22,829
kWh
$130
-
kW-mo/yr
- - -
TOTAL RECOMMENDED $56,345 $127,487 $30,871
541,624
kWh
$2,048
-
kW-mo/yr
$22,838
-
MMBtu
$739 $(-151.0)
TOTAL IMPLEMENTED $33,259 $94,999 $9,091
159,510
kWh
$742
-
kW-mo/yr
$22,838
-
MMBtu
$739 $(-151.0)
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings Natural Gas Savings Personnel Changes Savings Ancillary Material Cost Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs