ITAC Assessment: CM1001
ITAC logo
ITAC Assessment: CM1001
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2022
Principal Product Steam/Campus Heating System
NAICS 221330: Steam and Air-Conditioning Supply
SIC 4961: Steam and Air-Conditioning Supply
Sales Range less than $500
k
# of Employees 24
Plant Area 10,000
ft2
Annual Production 61,320,000
lb
Production Hrs. Annual 8,760
hrs
Location (State) Colorado

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $43,700 973,000
kWh
Electricity Demand $29,300 1,654
kW-mo/yr
Electricity Fees $1,150 -
Natural Gas $1,000,000 182,956
MMBtu
Waste Disposal Costs
Water Usage $18,000 2,266
Tgal
TOTAL YEARLY COSTS $1,092,150
RECOMMENDED SAVINGS* $9,720 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $6,070

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Natural Gas Savings Water Usage Savings
01 2.4239: Eliminate or reduce compressed air usage $5,400 $14,000 $5,900
155,000
kWh
$(-500.0)
-
kW-mo/yr
- -
02 2.2449: Recover heat from exhausted steam, hot air or hot water $2,550 $24,900 $350
13,200
kWh
$2,200
-
kW-mo/yr
- -
03 2.2511: Insulate bare equipment $190 $1,100 - - $190
-
MMBtu
-
04 2.7142: Utilize higher efficiency lamps and/or ballasts $480 $3,950 $190
5,280
kWh
$290
-
kW-mo/yr
- -
05 3.4151: Minimize water usage $1,100 $3,300 - - - $1,100
-
Tgal
TOTAL RECOMMENDED $9,720 $47,250 $6,440
173,480
kWh
$1,990
-
kW-mo/yr
$190
-
MMBtu
$1,100
-
Tgal
TOTAL IMPLEMENTED $6,070 $19,050 $6,090
160,280
kWh
$(-210.0)
-
kW-mo/yr
$190
-
MMBtu
-
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs