Search Recommendations
ITAC logo
Search Recommendations
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

657

matching recommendations
$
$
ARC 2+ Digits Required
NAICS Water supply and irrigation systems
SIC 2+ Digits Required
3+ Characters Required for Products
ID Description Yearly
Savings
Imp
Cost
WV0552 #03 Y:2017 Interlock heating and air conditioning systems to prevent simultaneous operation $14,015 $46,500
WV0552 #02 Y:2017 Use power during off-peak periods $17,322 $2,500
WV0552 #01 Y:2017 Use adjustable frequency drive or multiple speed motors on existing system $108,472 $401,920
MZ0232 #03 Y:2017 Reschedule plant operations or reduce load to avoid peaks $8,891 $10,000
MZ0232 #02 Y:2017 Eliminate leaks in water lines and valves $1,573 $6,000
MZ0232 #01 Y:2017 Use or replace with energy efficient substitutes $3,500 $25,000
MA0771 #03 Y:2016 Improve air circulation with destratification fans / other methods $527 $2,116
MA0771 #02 Y:2016 Optimize plant power factor $8,733 $3,480
MA0771 #01 Y:2016 Establish a predictive maintenance program $13,141 $1,000
WV0538 #11 Y:2016 Analyze flue gas for proper air/fuel ratio $140 $500
WV0538 #10 Y:2016 Insulate bare equipment $775 $1,293
WV0538 #09 Y:2016 Use radiant heater for spot heating $2,926 $9,400
WV0538 #08 Y:2016 Develop a repair/replace policy $2,754 $8,000
WV0538 #07 Y:2016 Utilize higher efficiency lamps and/or ballasts $3,896 $2,445
WV0538 #06 Y:2016 Develop a repair/replace policy $4,026 $1,510
WV0538 #05 Y:2016 Utilize higher efficiency lamps and/or ballasts $4,530 $1,622
WV0538 #04 Y:2016 Use evaporation to concentrate material $5,300 $2,250
WV0538 #03 Y:2016 Establish a predictive maintenance program $6,105 $28,500
WV0538 #02 Y:2016 Use adjustable frequency drive or multiple speed motors on existing system $9,806 $6,000
WV0538 #01 Y:2016 Establish a predictive maintenance program $20,108 $1,000