Assessment Year | 2017 |
---|---|
Principal Product | Water |
NAICS | 221310: Water Supply and Irrigation Systems |
SIC | 4941: Water Supply |
Sales Range | $50 M to 100M |
# of Employees | 17 |
Plant Area |
476,685
ft2
|
Annual Production | 11,000,000
Tgal
|
Production Hrs. Annual | 8,760
hrs
|
Location (State) | Pennsylvania |
Facility Energy Cost and Usage
Source | Yearly Cost | Usage | Unit Cost | |
---|---|---|---|---|
Electricity Usage | $1,874,718 | 31,217,030 |
kWh
|
$0.060 |
Electricity Demand | $69,796 | 65,712 |
kW-mo/yr
|
$1.06 |
Natural Gas | $42,910 | 5,816 |
MMBtu
|
$7.38 |
TOTAL YEARLY COSTS | $1,987,424 | |||
RECOMMENDED SAVINGS* | $169,073 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
IMPLEMENTED SAVINGS* | $32,860 |
Recommendations
# | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Electricity Demand Savings | Natural Gas Savings | Personnel Changes Savings | Administrative Changes Savings |
---|---|---|---|---|---|---|---|---|---|
01 | 2.4146: Use adjustable frequency drive or multiple speed motors on existing system | $108,472 | $401,920 |
$108,472
1,804,860
kWh
|
- | - | - | - | |
02 | 2.3137: Use power during off-peak periods | $17,322 | $2,500 | - |
$3,562
-
kW-mo/yr
|
- | $(-6,240.0) | $20,000 | |
03 | 2.7264: Interlock heating and air conditioning systems to prevent simultaneous operation | $14,015 | $46,500 |
$12,065
200,745
kWh
|
$983
-
kW-mo/yr
|
$967
-
MMBtu
|
- | - | |
04 | 2.4151: Develop a repair/replace policy | $13,726 | $620 |
$13,714
228,180
kWh
|
$332
-
kW-mo/yr
|
- | - | $(-320.0) | |
05 | 2.4157: Establish a predictive maintenance program | $9,424 | $1,000 |
$10,158
169,023
kWh
|
$246
-
kW-mo/yr
|
- | - | $(-980.0) | |
06 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $3,201 | $10,486 |
$3,106
51,688
kWh
|
$95
-
kW-mo/yr
|
- | - | - | |
07 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $2,913 | $3,240 |
$2,844
47,329
kWh
|
$69
-
kW-mo/yr
|
- | - | - | |
TOTAL RECOMMENDED | $169,073 | $466,266 |
$150,359
2,501,825
kWh
|
$5,287
-
kW-mo/yr
|
$967
-
MMBtu
|
$(-6,240.0) | $18,700 | ||
TOTAL IMPLEMENTED | $32,860 | $17,226 |
$16,108
268,040
kWh
|
$3,972
-
kW-mo/yr
|
- | $(-6,240.0) | $19,020 | ||
Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | Electricity Demand Savings | Natural Gas Savings | Personnel Changes Savings | Administrative Changes Savings |
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs