ITAC Assessment: MZ0232
ITAC logo
ITAC Assessment: MZ0232
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2017
Principal Product drinking water
NAICS 221310: Water Supply and Irrigation Systems
SIC 4941: Water Supply
Sales Range $1
M
to 5
M
# of Employees 98
Plant Area 2,600
ft2
Annual Production 715,002
Tgal
Production Hrs. Annual 4,745
hrs
Location (State) Missouri

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $160,772 2,161,030
kWh
Electricity Demand $89,219 11,107
kW-mo/yr
TOTAL YEARLY COSTS $249,991
RECOMMENDED SAVINGS* $13,964 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $8,891

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings
01 2.4322: Use or replace with energy efficient substitutes $3,500 $25,000 $3,500
47,450
kWh
-
02 3.4154: Eliminate leaks in water lines and valves $1,573 $6,000 $1,573
21,257
kWh
-
03 2.3131: Reschedule plant operations or reduce load to avoid peaks $8,891 $10,000 - $8,891
-
kW-mo/yr
TOTAL RECOMMENDED $13,964 $41,000 $5,073
68,707
kWh
$8,891
-
kW-mo/yr
TOTAL IMPLEMENTED $8,891 $10,000 - $8,891
-
kW-mo/yr
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs