Assessment Year | 2014 |
---|---|
Principal Product | Automotive bearing |
NAICS | 336310: Motor Vehicle Gasoline Engine and Engine Parts Manufacturing |
SIC | 3562: Ball and Roller Bearings |
Sales Range | $50 M to 100M |
# of Employees | 600 |
Plant Area |
216,000
ft2
|
Annual Production | 150,000,000
pieces
|
Production Hrs. Annual | 7,250
hrs
|
Location (State) | Virginia |
Facility Energy Cost and Usage
Source | Yearly Cost | Usage | Unit Cost | |
---|---|---|---|---|
Electricity Usage | $1,082,604 | 33,998,400 |
kWh
|
$0.032 |
Electricity Demand | $1,292,758 | 62,573 |
kW-mo/yr
|
$20.66 |
Electricity Fees | $3,480 | - |
|
- |
Natural Gas | $196,736 | 32,275 |
MMBtu
|
$6.10 |
TOTAL YEARLY COSTS | - | |||
RECOMMENDED SAVINGS* | $105,257 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
IMPLEMENTED SAVINGS* | $101,427 |
Recommendations
# | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Electricity Demand Savings | Personnel Changes Savings | Administrative Changes Savings | Ancillary Material Cost Savings |
---|---|---|---|---|---|---|---|---|---|
01 | 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves | $17,220 | $200 |
$9,288
281,451
kWh
|
$11,132
-
kW-mo/yr
|
$(-1,600.0) | - | $(-1,600.0) | |
02 | 2.4224: Upgrade controls on compressors | $80,544 | $28,000 |
$36,632
1,110,048
kWh
|
$43,912
-
kW-mo/yr
|
- | - | - | |
03 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $836 | $240 |
$212
6,412
kWh
|
$175
-
kW-mo/yr
|
- | - | $449 | |
04 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $874 | $1,255 |
$253
7,675
kWh
|
$598
-
kW-mo/yr
|
- | $23 | - | |
05 | 2.3132: Recharge batteries on during off-peak demand periods | $625 | $100 | - |
$625
-
kW-mo/yr
|
- | - | - | |
06 | 2.4111: Utilize energy-efficient belts and other improved mechanisms | $2,956 | $1,935 |
$1,339
40,571
kWh
|
$1,617
-
kW-mo/yr
|
- | - | - | |
07 | 2.4151: Develop a repair/replace policy | $2,202 | $4,256 |
$1,006
30,221
kWh
|
$1,196
-
kW-mo/yr
|
- | - | - | |
TOTAL RECOMMENDED | $105,257 | $35,986 |
$48,730
1,476,378
kWh
|
$59,255
-
kW-mo/yr
|
$(-1,600.0) | $23 | $(-1,151.0) | ||
TOTAL IMPLEMENTED | $101,427 | $32,796 |
$47,138
1,428,132
kWh
|
$57,040
-
kW-mo/yr
|
$(-1,600.0) | - | $(-1,151.0) | ||
Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | Electricity Demand Savings | Personnel Changes Savings | Administrative Changes Savings | Ancillary Material Cost Savings |
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs