| Assessment Year | 2017 |
|---|---|
| Principal Product | Treated drinking water |
| NAICS | 221310: Water Supply and Irrigation Systems |
| SIC | 4941: Water Supply |
| Sales Range | $1 M to 5M |
| # of Employees | 4 |
| Plant Area |
13,000
ft2
|
| Annual Production | 1,359,540
Tgal
|
| Production Hrs. Annual | 3,094
hrs
|
| Location (State) | Massachusetts |
Facility Energy Cost and Usage
| Source | Yearly Cost | Usage | Unit Cost | |
|---|---|---|---|---|
| Electricity Usage | $250,248 | 2,245,080 |
kWh
|
$0.11 |
| Electricity Demand | $87,404 | 3,633 |
kW-mo/yr
|
$24.06 |
| Electricity Fees | $(-436.0) | - |
|
- |
| Natural Gas | $12,054 | 1,703 |
MMBtu
|
$7.08 |
| TOTAL YEARLY COSTS | $349,270 | |||
| RECOMMENDED SAVINGS* | $22,401 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
| IMPLEMENTED SAVINGS* | $13,668 | |||
Recommendations
| # | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Electricity Demand Savings | Natural Gas Savings | Administrative Changes Savings |
|---|---|---|---|---|---|---|---|---|
| 01 | 2.4157: Establish a predictive maintenance program | $13,141 | $1,000 |
$11,907
107,266
kWh
|
$4,114
-
kW-mo/yr
|
- | $(-2,880.0) | |
| 02 | 2.3212: Optimize plant power factor | $8,733 | $3,480 | - |
$8,733
-
kW-mo/yr
|
- | - | |
| 03 | 2.7243: Improve air circulation with destratification fans / other methods | $527 | $2,116 |
$(-161.0)
(-1,453)
kWh
|
$(-48.0)
-
kW-mo/yr
|
$736
-
MMBtu
|
- | |
| TOTAL RECOMMENDED | $22,401 | $6,596 |
$11,746
105,813
kWh
|
$12,799
-
kW-mo/yr
|
$736
-
MMBtu
|
$(-2,880.0) | ||
| TOTAL IMPLEMENTED | $13,668 | $3,116 |
$11,746
105,813
kWh
|
$4,066
-
kW-mo/yr
|
$736
-
MMBtu
|
$(-2,880.0) | ||
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs