ITAC Assessment: MA0771
ITAC logo
ITAC Assessment: MA0771
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2017
Principal Product Treated drinking water
NAICS 221310: Water Supply and Irrigation Systems
SIC 4941: Water Supply
Sales Range $1
M
to 5
M
# of Employees 4
Plant Area 13,000
ft2
Annual Production 1,359,540
Tgal
Production Hrs. Annual 3,094
hrs
Location (State) Massachusetts

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $250,248 2,245,080
kWh
Electricity Demand $87,404 3,633
kW-mo/yr
Electricity Fees $(-436.0) -
Natural Gas $12,054 1,703
MMBtu
TOTAL YEARLY COSTS $349,270
RECOMMENDED SAVINGS* $22,401 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $13,668

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Natural Gas Savings Administrative Changes Savings
01 2.4157: Establish a predictive maintenance program $13,141 $1,000 $11,907
107,266
kWh
$4,114
-
kW-mo/yr
- $(-2,880.0)
02 2.3212: Optimize plant power factor $8,733 $3,480 - $8,733
-
kW-mo/yr
- -
03 2.7243: Improve air circulation with destratification fans / other methods $527 $2,116 $(-161.0)
(-1,453)
kWh
$(-48.0)
-
kW-mo/yr
$736
-
MMBtu
-
TOTAL RECOMMENDED $22,401 $6,596 $11,746
105,813
kWh
$12,799
-
kW-mo/yr
$736
-
MMBtu
$(-2,880.0)
TOTAL IMPLEMENTED $13,668 $3,116 $11,746
105,813
kWh
$4,066
-
kW-mo/yr
$736
-
MMBtu
$(-2,880.0)
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs