Assessment Year | 2017 |
---|---|
Principal Product | Water Treatment |
NAICS | 221310: Water Supply and Irrigation Systems |
SIC | 4941: Water Supply |
Sales Range | $1 M to 5M |
# of Employees | 60 |
Plant Area |
50,000
ft2
|
Annual Production | 750,000
Tgal
|
Production Hrs. Annual | 8,760
hrs
|
Location (State) | Maryland |
Facility Energy Cost and Usage
Source | Yearly Cost | Usage | Unit Cost | ||
---|---|---|---|---|---|
Electricity Usage | $601,139 | 3,986,825 |
kWh
|
$0.15 | |
Fuel Oil #1 | $7,900 | 395 |
MMBtu
|
$20.00 | |
Fuel Oil #2 | $6,740 | 410 |
MMBtu
|
$16.44 | |
Waste Disposal Costs | |||||
Water Usage | $5,300 | 441,650 |
Tgal
|
$0.012 | |
TOTAL YEARLY COSTS | $621,079 | ||||
RECOMMENDED SAVINGS* | $60,366 |
See individual recommendations below
*Non-energy impacts included in savings.
|
|||
IMPLEMENTED SAVINGS* | $46,207 |
Recommendations
# | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Fuel Oil #1 Savings | Fuel Oil #2 Savings | Personnel Changes Savings | Water Consumption Savings |
---|---|---|---|---|---|---|---|---|---|
01 | 2.4157: Establish a predictive maintenance program | $20,108 | $1,000 |
$21,458
142,295
kWh
|
- | - | $(-1,350.0) | - | |
02 | 2.4146: Use adjustable frequency drive or multiple speed motors on existing system | $9,806 | $6,000 |
$9,806
65,026
kWh
|
- | - | - | - | |
03 | 2.4157: Establish a predictive maintenance program | $6,105 | $28,500 |
$6,105
40,484
kWh
|
- | - | - | - | |
04 | 3.3131: Use evaporation to concentrate material | $5,300 | $2,250 | - | - | - | - |
$5,300
-
Tgal
|
|
05 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $4,530 | $1,622 |
$4,530
30,042
kWh
|
- | - | - | - | |
06 | 2.4151: Develop a repair/replace policy | $4,026 | $1,510 |
$4,526
30,015
kWh
|
- | - | $(-500.0) | - | |
07 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $3,896 | $2,445 |
$3,896
25,836
kWh
|
- | - | - | - | |
08 | 2.4151: Develop a repair/replace policy | $2,754 | $8,000 |
$2,754
18,261
kWh
|
- | - | - | - | |
09 | 2.7231: Use radiant heater for spot heating | $2,926 | $9,400 | - |
$1,578
-
MMBtu
|
$1,348
-
MMBtu
|
- | - | |
10 | 2.2511: Insulate bare equipment | $775 | $1,293 | - |
$200
-
MMBtu
|
$575
-
MMBtu
|
- | - | |
11 | 2.1233: Analyze flue gas for proper air/fuel ratio | $140 | $500 | - |
$100
-
MMBtu
|
$115
-
MMBtu
|
$(-75.0) | - | |
TOTAL RECOMMENDED | $60,366 | $62,520 |
$53,075
351,959
kWh
|
$1,878
-
MMBtu
|
$2,038
-
MMBtu
|
$(-1,925.0) |
$5,300
-
Tgal
|
||
TOTAL IMPLEMENTED | $46,207 | $23,770 |
$44,216
293,214
kWh
|
$1,878
-
MMBtu
|
$2,038
-
MMBtu
|
$(-1,925.0) | - | ||
Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | Fuel Oil #1 Savings | Fuel Oil #2 Savings | Personnel Changes Savings | Water Consumption Savings |
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs