Search Recommendations
ITAC logo
Search Recommendations
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

657

matching recommendations
$
$
ARC 2+ Digits Required
NAICS Water supply and irrigation systems
SIC 2+ Digits Required
3+ Characters Required for Products
ID Description Yearly
Savings
Imp
Cost
SF0536 #03 Y:2019 Replace hydraulic / pneumatic equipment with electric equipment $47,766 $327,497
SF0536 #02 Y:2019 Utilize higher efficiency lamps and/or ballasts $5,261 $16,688
SF0536 #01 Y:2019 Reschedule plant operations or reduce load to avoid peaks $1,886 -
UD0991 #04 Y:2018 Use most efficient equipment at it's maximum capacity and less efficient equipment only when necessary $1,066 -
UD0991 #03 Y:2018 Minimize water usage $10,365 -
UD0991 #02 Y:2018 Use power during off-peak periods $15,085 -
UD0991 #01 Y:2018 Reschedule plant operations or reduce load to avoid peaks $16,716 -
MA0796 #06 Y:2018 Lower temperature during the winter season and vice-versa $634 $200
MA0796 #05 Y:2018 Utilize higher efficiency lamps and/or ballasts $1,405 $2,499
MA0796 #04 Y:2018 Change procedures / equipment / operating conditions $1,678 $300
MA0796 #03 Y:2018 Lower temperature during the winter season and vice-versa $3,193 $200
MA0796 #02 Y:2018 Use adjustable frequency drive or multiple speed motors on existing system $7,245 $6,660
MA0796 #01 Y:2018 Replace electrically-operated equipment with fossil fuel equipment $4,315 $14,350
UU0141 #05 Y:2018 Install occupancy sensors $3,778 $1,225
UU0141 #04 Y:2018 Use / purchase optimum sized compressor $30,073 -
UU0141 #03 Y:2018 Moderate cooling tower outlet temperature $149,664 $22,400
UU0141 #02 Y:2018 Utilize higher efficiency lamps and/or ballasts $176,898 $256,282
UU0141 #01 Y:2018 Closely monitor chemical additions to increase bath life $377,727 $30
UA0205 #05 Y:2018 Replace existing hvac unit with high efficiency model $7,670 $1,600
UA0205 #04 Y:2018 Modify startup/shutdown times $280 -