ITAC Assessment: UA0205
ITAC logo
ITAC Assessment: UA0205
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2019
Principal Product Fresh Water
NAICS 221310: Water Supply and Irrigation Systems
SIC 4941: Water Supply
Sales Range $10
M
to 50
M
# of Employees 9
Plant Area 311,850
ft2
Annual Production 1,500,000
Tgal
Production Hrs. Annual 8,760
hrs
Location (State) Alabama

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $286,188 2,735,880
kWh
Electricity Demand $18,699 3,945
kW-mo/yr
Electricity Fees $(-4,122.0) -
TOTAL YEARLY COSTS $300,765
RECOMMENDED SAVINGS* $73,098 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $980

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Electricity Fees Savings
01 2.7142: Utilize higher efficiency lamps and/or ballasts $700 $1,908 $661
6,835
kWh
- $39
02 2.4133: Use most efficient type of electric motors $51,026 $98,308 $47,781
441,822
kWh
$7,034
-
kW-mo/yr
$(-3,789.0)
03 2.4146: Use adjustable frequency drive or multiple speed motors on existing system $13,422 $18,747 $10,839
98,217
kWh
$3,873
-
kW-mo/yr
$(-1,290.0)
04 4.454: Modify startup/shutdown times $280 - - - $280
05 2.7232: Replace existing hvac unit with high efficiency model $7,670 $1,600 $7,247
74,882
kWh
- $423
TOTAL RECOMMENDED $73,098 $120,563 $66,528
621,756
kWh
$10,907
-
kW-mo/yr
$(-4,337.0)
TOTAL IMPLEMENTED $980 $1,908 $661
6,835
kWh
- $319
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs